My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA EMPOWERMENT CORPORATION - 2000
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA EMPOWERMENT CORPORATION - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 12:10:10 PM
Creation date
9/11/2007 3:30:56 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA EMPOWERMENT CORPORATION
Contract #
A-2000-1 53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />. All material excavated or graded will be sufficiently watered <br />to prevent excessive amounts of dust. Watering with complete <br />coverage shall occur at least twice daily, once in the late <br />morning and once after work is done for the day. <br /> <br />. All clearing and earthwork activities shall cease during <br />period of high winds (winds greater than 25 mph averaged over <br />one hour) or during Stage 1 or Stage 2 smog episodes. <br /> <br />. Streets surrounding the project site should be cleaned at the <br />end of each day of construction. <br /> <br />. All material transported offsite shall either be sufficiently <br />watered or securely covered to prevent excessive amounts of <br />dust. <br /> <br />. The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br /> <br />. Equipment engines shall be maintained in good condition and in <br />proper tune according to manufacturer's specifications. <br /> <br />. To the extent feasible, gasoline powered equipment shall be <br />used for onsite and offsite construction activities. <br /> <br />(D) Less than Significant Impact <br /> <br />The proposed project site is within the immediate vicinity of <br />several sensitive receptors. However, it has been determined <br />that the proposed project would not result in significant long- <br />term air quality impacts. Mitigation measures have been <br />incorporated into the proposed project to reduce potential <br />construction-related air quality impacts to a level that is <br />considered less than significant. Therefore, implementation of <br />the proposed project would not expose sensitive receptors to any <br />substantial concentrations of air quality pollutants. <br /> <br />(E) No Impact <br /> <br />The proposed project would not generate any short-term <br />construction related or long-term operational odors. <br /> <br />25.H. <br /> <br />Page 86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.