My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA EMPOWERMENT CORPORATION - 2000
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA EMPOWERMENT CORPORATION - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 12:10:10 PM
Creation date
9/11/2007 3:30:56 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA EMPOWERMENT CORPORATION
Contract #
A-2000-1 53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />According to the City's General Plan there are no known active <br />earthquake faults or fault zones on the proposed project site. <br />Therefore, the project site does not have the potential for <br />ground rupture. <br /> <br />(A-2) Less Than Significant Impact <br /> <br />The proposed project site is located within a region known to <br />contain active earthquake faults. Similar to many other areas in <br />Southern California, slight to moderate ground shaking may occur <br />on the project site if an earthquake occurs along one of the <br />faults in the region. To reduce potential impacts associated <br />with seismic activity to a level that is below significant, the <br />proposed project would be designed in accordance with the latest <br />seismic safety standards of the Uniform Building Code. <br /> <br />(A-3) Less Than Significant Impact <br /> <br />According to the City's General Plan EIR, the proposed project <br />site is located in an area that is characterized with very high <br />liquefaction potential. However, as part of the City's <br />development review process, a geotechnical study would be <br />prepared to identify the needed improvements to reduce the <br />potential for liquefaction impacts to a level that is less than <br />significant. <br /> <br />(A-4) No Impact <br /> <br />The project site is flat without any topographical relief. <br />According to the City's General Plan, there are no landslide <br />planes on the project site. Therefore, implementation of the <br />project would not result in adverse impacts in regards to <br />landslides. <br /> <br />(B) Less Than Significant Impact with Mitigation <br /> <br />The proposed project site would involve earthwork activities to <br />construct a new recreation/community center and parking areas. <br />Disturbed soils on the project site could result in erosion <br />impacts to onsite and offsite drainage facilities. This <br />potential impact could increase during periods of rain. To <br />reduce potential erosion impacts, the following mitigation <br />measure shall be implemented. <br /> <br />25.H. <br /> <br />Page 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.