My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA EMPOWERMENT CORPORATION - 2000
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA EMPOWERMENT CORPORATION - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 12:10:10 PM
Creation date
9/11/2007 3:30:56 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA EMPOWERMENT CORPORATION
Contract #
A-2000-1 53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />would not have any adverse impacts on recreational services or <br />facilities. <br /> <br />xv. TRANSPORTATION/TRAFFIC <br /> <br />(A.B) Less Than Significant Impact <br /> <br />The proposed project would be situated within a residential <br />area. Access to the project site would be provided from Halladay <br />Street and Central Avenue. The City's General Plan identifies <br />that roadways and intersections within the project area are <br />operating at adequate level of services. Additionally, under a <br />future built out condition with recommended improvements, the <br />General Plan also identifies that roadways and intersections <br />would operate at adequate levels of service. The current and <br />projected level of service is based on the land uses established <br />in the General Plan. <br /> <br />The proposed project would generate less traffic than the former <br />city yard facility. Implementation of the proposed project <br />would not significantly impact current levels of service on <br />project area roadways and intersection. <br /> <br />The City's General Plan designates the project site open space. <br />The proposed project would be consistent with the General Plan <br />and the traffic projections for the project area. Implementation <br />of the proposed project would not individually or cumulatively <br />exceed any required level of service established by the City or <br />by the County's Congestion Management Program. <br /> <br />(C) No Impact <br /> <br />The proposed project involves the improvement and expansion of <br />an existing park. Implementation of the proposed project would <br />not result in any changes to air traffic patterns. <br />Implementation of the proposed project would not result in any <br />substantial safety risks related to aircraft traffic. <br /> <br />(D) Less Than Significant Impact With Mitigation <br /> <br />Construction operations associated the proposed project would <br />result in a short-term increase of construction traffic volumes <br />in the project area. The increased level of construction traffic <br />is not expected to significantly affect the capacity of existing <br />roadways in the project area. However, truck trips during <br /> <br />Page 95 <br /> <br />25.H. <br />
The URL can be used to link to this page
Your browser does not support the video tag.