Laserfiche WebLink
Bella Terra Residential Community and Temple Project <br /> Psomas will also review the Project plans,design,and Traffic Memorandum to evaluate operational <br /> noise impacts to offsite sensitive receptors(i.e.,the residential units located to the north, south, <br /> east,and west). Onsite noise sources such as the operation of HVAC units and common <br /> residential activities will be qualitatively evaluated against the standards contained in the City's <br /> General Plana nd Noise Ordinances. Increases in traffic noise on local roadways will also be <br /> discussed and quantified. If mitigation measures are required to minimize noise and vibration <br /> impacts,recommend measures will be coordinated with the City. Lastly, a discussion on aircraft <br /> noise emanating from the John Wayne Airport will be included,even though the Airport is located <br /> over five miles southeast of the Project site.A Noises action will be developed summarizing the <br /> findings of the analysis,and the support data and calculations will be provided as an appendix. <br /> Transportation <br /> Psomas will provide a Traffic Memorandum forthe Bella Terra development;a Traffic Impact <br /> Analysis(TIA) is not anticipated to be required due to the size of the Project. The Project is <br /> ex ected-to ene-rate-1-1-net- -e-aK-h-our-tri -s-and-1-28-rret-d�il r' — -- --- <br /> p g p p yt rp�Bas�d o�City of-Santa Ana <br /> guidelines,the Project will screen out of Vehicle Miles Traveled (VMT)due to its location in a low- <br /> VMT area. Psomas will provide a Memorandum to document the screening and additional discuss, <br /> as necessary. The Memorandum will include the following: <br /> • A description of existing transportation facilities and traffic control in the immediate <br /> Project vicinity <br /> • A discussion of Project site access <br /> • Trip generation estimates for the Project <br /> • A discussion of VMT screening <br /> • Responses to the four CEQA transportation questions <br /> A 24-hour count will be conducted on West Hazard Avenue along the frontage of the Projoctto assist <br /> with the air quality and noise analyses. No analysis or traffic design is assumed in this SOW. If the <br /> City determines that a TIA is required,a Side Letter Amendment will be required.This process would <br /> require resubmission to legal for review and signatures. <br /> Subtask 2.2 Peer Review of Existing Technical Studies <br /> As indicated above,we assume a number of studies(i.e., Hydrology and Water Quality, <br /> Geotechnical, and Phase I ESA)may have been prepared by the Applicant's consultants for the <br /> Project. If these reports are available and provided to Psomas,we will conduct a review of each of <br /> the studies for CEQA adequacy and prepare a Memorandum summarizing the comments and <br /> recommendations, as necessary. <br /> Srabtask2.2 Deliverables <br /> • Electronic Copies(email)of Peer Review Memorandum (for existing studies,as available) <br /> A:Wwp—La%5antgna%Mk1a Terra\FInaA0eU Terra_WNDM2425.dacz A-5 Scope of Work <br />