Laserfiche WebLink
Bella Terra Residential Community and Temple Project <br />Tribal Consultation. If requested bythe City, Psomas will provide tribal consultation support as <br />needed to the City to fulfill the agency -to -agency consultation requirements of Assembly Bill 52 (AB <br />52) and Tribal Cultural Resources (TCR) as well as Senate Bill (SB 18). <br />AB 52 requires a Lead Agency to provide formal notification to tribal representatives that are <br />traditionally and culturally affiliated to the geographic area where a Project is located. This task <br />assumes the preparation of up to eight letters on the City letterhead; one round of review by the <br />City; and up to four hours of telephone consultation in concert with the City, as needed to consult <br />with Tribes. The tribal representatives have 30 days to request consultation upon receiving the AB <br />52 notification letter, and they have 90 days to request consultation for SB 18. Psomas can provide <br />further support related to AB 52 and SB 18 consultation, such as additional meetings, minutes, or <br />additional site visits, subject to a Side Letter Amendment. This process would require re- <br />submission to legal for review and signatures. <br />The results of the records searches, site walk, and tribal consultations will be compiled and <br />--described-in the-appropriate-sections-of-the-require-d-environm-ental-document.—If-p-otent[al ----- — <br />significant impacts to resources are identified, Psomas will recommend mitigation measures to <br />address those impacts. <br />This scope of work does not include evaluations of historical properties. Evaluation of properties <br />will require a Side Letter Amendment. This process would require re -submission to legal for review <br />and signatures. <br />Enery <br />Psomas will develop an Energy Analysis for the Project, which wilt include a discussion of the <br />regulatory setting, energy demands, Project energy efficiency measures, impact assessment, and <br />mitigation measures, if necessary. The regulatory setting will include a discussion of the local, <br />State, and federal policies and regulations that apply to the Project. The discussion of Project <br />related energy demands will include quantification of anticipated energy consumption from the <br />Project's construction and operations phases. Construction phase energy demand is due to diesel <br />and gasoline consumption used during the development of the Project. The operations phase of <br />the Project would consume energy related to lighting and heating needs as well as vehicle trips. <br />Potential impacts will be assessed relative to Project consistency with the Energy Element of the <br />City of Santa Ana General Plan and State of California Energy Efficiency Standards. An <br />environmental analysis section for Energy will be prepared to discuss the findings of the <br />quantitative energy analysis. Quantification sheets detailing Project energy consumption will be <br />provided as an appendix. <br />Noise <br />Psomas will prepare a noise and vibration analysis to evaluate potential impacts attributable to the <br />Project. Psomas will visit the Project sito to identify existing noise sources and to measure existing <br />noise levels at the Project site boundaries. A total of eight short-term noise measurements (20 <br />minutes each) will be collected from at least four different locations to characterize ambient noise <br />levels at each of the site boundaries. Psomas will model construction noise levels at the nearest <br />sensitive land uses using the Federal Highway Administration's Roadway Construction Noise <br />Model (RCNM) based on information provided in the Data Needs Request. Analysis of potential <br />vibration impacts will be assessed based on methods established by the Federal Transit <br />Administration (FTA). <br />P:wr0pa 1 9aarana%BanaTarralFlnaLlBsllaTerra_IbMNo-oz2425ADOX A -A 5copoofWork <br />