My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (12)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:47:44 AM
Creation date
3/27/2025 8:34:56 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-194-15A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bella Terra Residential Community and Temple Project <br /> Tribal Consultation. If requested bythe City, Psomas will provide tribal consultation support as <br /> needed to the City to fulfill the agency-to-agency consultation requirements of Assembly Bill 52(AB <br /> 52)and Tribal Cultural Resources(TCR)as well as Senate Bill(SB 18). <br /> AB 52 requires a Lead Agency to provide formal notification to tribal representatives that are <br /> traditionally and culturally affiliated to the geographic area where a Project is located.This task <br /> assumes the preparation of up to eight letters on the City letterhead; one round of review by the <br /> City; and up to four hours of telephone consultation in concert with the City,as needed to consult <br /> with Tribes.The tribal representatives have 30 days to request consultation upon receiving the AB <br /> 52 notification letter, and they have 90 days to request consultation for SB 18. Psomas can provide <br /> further support related to AB 52 and SB 18 consultation,such as additional meetings, minutes,or <br /> additional site visits,subject to a Side Letter Amendment.This process would require re- <br /> submission to legal for review and signatures. <br /> The results of the records searches,site walk,and tribal consultations will be compiled and <br /> --described-in the-appropriate-sections-of-the-require-d-environm-ental-document.—If-p-otentlal ----- — <br /> significant impacts to resources are identified, Psomas will recommend mitigation measures to <br /> address those impacts. <br /> This scope of work does not include evaluations of historical properties. Evaluation of properties <br /> will require a Side Letter Amendment.This process would require re-submission to legal for review <br /> and signatures. <br /> Enery <br /> Psomas will develop an Energy Analysis for the Project,which wilt include a discussion of the <br /> regulatory setting,energy demands, Project energy efficiency measures,impact assessment, and <br /> mitigation measures, if necessary.The regulatory setting will include a discussion of the local, <br /> State, and federal policies and regulations that apply to the Project.The discussion of Project <br /> related energy demands will include quantification of anticipated energy consumption from the <br /> Project's construction and operations phases.Construction phase energy demand is due to diesel <br /> and gasoline consumption used during the development of the Project.The operations phase of <br /> the Project would consume energy related to lighting and heating needs as well as vehicle trips. <br /> Potential impacts will be assessed relative to Project consistency with the Energy Element of the <br /> City of Santa Ana General Plan and State of California Energy Efficiency Standards.An <br /> environmental analysis section for Energy will be prepared to discuss the findings of the <br /> quantitative energy analysis. Quantification sheets detailing Project energy consumption will be <br /> provided as an appendix. <br /> Noise <br /> Psomas will prepare a noise and vibration analysis to evaluate potential impacts attributable to the <br /> Project. Psomas will visit the Project sito to identify existing noise sources and to measure existing <br /> noise levels at the Project site boundaries.A total of eight short-term noise measurements(20 <br /> minutes each)will be collected from at least four different locations to characterize ambient noise <br /> levels at each of the site boundaries. Psomas will model construction noise levels at the nearest <br /> sensitive land uses using the Federal Highway Administration's Roadway Construction Noise <br /> Model(RCNM) based on information provided in the Data Needs Request.Analysis of potential <br /> vibration impacts will be assessed based on methods established by the Federal Transit <br /> Administration (FTA). <br /> P:wrOp1A9enran.%B.K. Term_15MNo-oz2a2e.aoex A-A 5copo of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.