Laserfiche WebLink
Bella Terra Residential Community and Temple Project <br /> TASK2 TECHNICAL ANALYSES/STUDIES <br /> Subtasl<2.1 Proposed Technical Analyses. <br /> Several technical analyses will be prepared as part of the lS/MND sections by Psomas' in-house <br /> technical experts in support of an adequate environmental document,consistent with CEQA <br /> requirements.These analyses include Air Quality and Greenhouse Gas(GHG) Emissions,Cultural <br /> and Tribal Cultural Resources, Energy, Noise,and Transportation.The scopes are provided below. <br /> Air Quality and Greenhouse Gas Ernl_ s5 Ions <br /> Psomas will prepare air quality and greenhouse gas (GHG)analyses to evaluate the potential <br /> impacts related to the Project. Based on information provided, Psomas will draft reasonable worst- <br /> case scenarios for anticipated construction activities(i.e., most intensive phase,type of <br /> construction, construction start and completion dates,anticipated soil export and import, <br /> equipment mix)and long-term operations to be used as t e basis ofth_e-air_qu.a_lity_moA-e_li.ng.— <br /> Psomas will calculate the Project's construction and operational criteria pollutant regional(mass) <br /> emissions using the latest version of the CalEEMod air pollutant emissions model. Model results <br /> will be compared with the SCAQMD's CEQA mass emissions thresholds,SCAQMD Localized <br /> Significance Thresholds Look-Up Tables will be used to analyze exposure of nearby off-site <br /> sensitive receptors; as such,no site-specific dispersion modeling is proposed as part of this scope <br /> of work. It is expected that the Project would not generate traffic congestion at a major intersection <br /> at a magnitude that would cause a local carbon monoxide(CO)"hotspot"due to the lack of motor <br /> vehicle trips and traffic congestion.Thus, no dispersion modeling is included in this Scope of Work <br /> for CO analysis.The analysis will include an evaluation of Project conformity with the Air Quality <br /> Management Plan for the South Coast Air Basin, as well as an analysis of Project consistency with <br /> relevant GHG reduction plans.A discussion of potential mitigation measures may be included if <br /> Project emissions result in air quality or greenhouse gas emission impacts.The findings will be <br /> provided in the Air Quality and GHG sections of the environmental document. <br /> Cultural Resources and Tribal_Cultural Resources <br /> Background Research. Psomas will submit a request to the California Historical Resources <br /> Information System (CHRIS)at the South-Central Coastal Information Center(SCCIC)to conduct a <br /> records search for the Project site, including a 1/2-mile search radius.The SCCIC currently <br /> estimates one month from the date of request to receive the results of the records search. <br /> Additionally, Psomas will request the Native American Heritage Commission(NAHC) conduct a <br /> search of the Sacred Lands File(SLF)database for the Project site.The NAHC currently estimates <br /> four weeks from the date of request to receive the results from the Sacred Lands File database. <br /> Psomas will also request a paleontological resources records search and literature review for the <br /> site from the Vertebrate Paleontology Section of the Natural History Museum (NHM)of Los Angeles <br /> County.The NHM provides a letter summarizing information on geological formations and known <br /> paleontological localities(if any)near the Project site,and a determination of the paleontological <br /> sensitivity of the geologic units underlying the site.The NHM currently estimates throe weeks from <br /> the date of request to receive the results of the records search. <br /> Site Visit. Psomas will also complete one visit to the Project site.This SOW assumes that no <br /> cultural resources,either newly identified or previously recorded,will be encountered in the <br /> Project site that will require documentation and/or evaluation. If cultural resources are identified,a <br /> Side Letter Amendment will be required.This process would require re-submission to legal for review <br /> and signatures. <br /> R:Troposels%SentAnaXSella7err T-inallsallaTarra_ISMND-a22g25,dn" A-3 Scope of Work <br />