Laserfiche WebLink
CORNERSTONE VILLAGE IMPROVEMENTS PRELIMINARY MATERIALS LIST <br />ITEM <br />No. <br />ITEM <br />DESCRIPTION <br />UNIT OF <br />MEASURE <br />ESTIMATED <br />QUANITITY <br />1 <br />COLD PLANE TOP 2" AC <br />SF <br />209400 <br />209400 <br />2 <br />PLACE PAVEMENT REINFORCING FABRIC <br />SY <br />23300 <br />23300 <br />3 <br />CONSTRUCT 2" AC OVERLAY <br />TON <br />2530 <br />2530 <br />4 <br />CONSTRUCT 3" AC CONCRETE <br />TON <br />750 <br />1910 <br />5 <br />CONSTRUCT 6" AGGREGATE BASE <br />CY <br />760 <br />1950 <br />6 <br />CONST. TYPE B-1 CURB PER STD. No, 1101 <br />LF <br />100 <br />100 <br />7 <br />CONST. TYPE A-2-8 C&G PER STD. No. 1101 <br />LF <br />860 <br />860 <br />8 <br />CONST. 4" PLASTIC DRAIN PIPE <br />LF <br />820 <br />820 <br />9 <br />CONST. CROSS GUTTER PER STD. No. 1109 <br />SF <br />500 <br />500 <br />10 <br />CONST. RIBBON GUTTER PER DETAIL <br />LF <br />200 <br />200 <br />11 <br />CONST. DRIVEWAY PER STD. No. 1112 <br />EA <br />2500 <br />5 <br />12 <br />CONST. ACCESS RAMP PER STD. No. 1122 <br />EA <br />800 <br />5 <br />13 <br />ENHANCED PAVING <br />SF <br />13700 <br />13700 <br />14 <br />INSTALL 4" WHITE STRIPING (PKG. STALLS) <br />LF <br />14040 <br />18000 <br />15 <br />INSTALL PAVEMENT MARKING <br />EA <br />5 <br />5 <br />16 <br />INSTALL SIGN <br />EA <br />8 <br />8 <br />17 <br />RELOCATE SIGN <br />EA <br />5 <br />5 <br />18 <br />REMOVE CURB AND GUTTER <br />LF <br />6 <br />300 <br />19 <br />REMOVE CROSS GUTTER <br />SF <br />14 <br />500 <br />20 <br />REMOVE CONCRETE DRIVEWAY <br />SF <br />43 <br />1730 <br />21 <br />REMOVE CONCRETE RIBBON GUTTER <br />LF <br />76 <br />340 <br />22 <br />REMOVE AC & BASE <br />CY <br />4000 <br />4000 <br />23 <br />CONSTRUCT 8-FOOT MASONRY BLOCK WALL <br />SF <br />1590 <br />12720 <br />24 <br />CONSTRUCT TRASH ENCLOSURE PER DETAIL <br />EA <br />25 <br />35 <br />25 <br />IRRIGATION <br />SF <br />1 <br />69000 <br />26 <br />LANDSCAPING <br />SF <br />1 <br />69000 <br />27 <br />INSTALL ENTRANCE DETAILS (MACFADDEN) <br />EA <br />2 <br />2 <br />28 <br />INSTALL ENTRANCE DETAILS WAKEHAM & GRANT <br />EA <br />2 <br />2 <br />29 <br />REPAIR/REFINISH EXISTING FENCES <br />LF <br />3550 <br />3550 <br />30 <br />AREA LIGHTING <br />LS <br />1 <br />1 <br />31 <br />PARKETTE SEAT]NGIPAVINGIFENCE/TRASH RECP.) <br />EA <br />3 <br />3 <br />32 <br />CONTRACTOR MOBILIZATION <br />LS <br />1 <br />1 <br />Exhibit D: 4 of 5 <br />