Laserfiche WebLink
CITY Or SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6600 <br /> BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br /> Item Description Qty Unit Unit Price Amount <br /> Excavation,Removals,Bedding,and <br /> Backfill <br /> 30 Construct 3"Sch 80 PVC Pipe(Pump $ $ <br /> Manhole to Curb)Incl,Trenching, 80 LF 160 12,800 <br /> Removals,Bedding,and Backfill <br /> 31 Install 6"Perforated Single Wall HDPE $ $ <br /> Pipe Incl.Filter Sock,Drainage Stone, 145 LF 110 15,950 <br /> and Non-Woven Geotextile <br /> 32 Install Shallow 6"Dual Wall HDPE Pipe $ $ <br /> Incl.Trenching,Removals,Bedding,and 400 LF 200 80,000 <br /> Backfill Detail E Sheet DD-06 <br /> 33 Install Shallow 8"Dual Wall HDPE Pipe $ $ <br /> Incl.Trenching,Removals,Bedding,and 60 LF 300 18,000 <br /> Backfill(Detail E,Sheet DD-06 <br /> 34 InstaIl Shallow 12"Dual Wall HDPE $ $ <br /> Pipe Incl.Trenching,Removals, 420 LF 180 75,600 <br /> Bedding,and Backfill(Detail E,Sheet <br /> DD-06 <br /> 35 Install Underdrain Cleanout in Paved $ $ <br /> Area Including Cast Iron Frame and 9 EA 2,500 22,500 <br /> Cover <br /> 36 Install V Water Service(Water Main $ $ 18,000 <br /> Point of Connection to Meter) I LS 18,000 <br /> 37 Install 2"Water Service(Water Main 1 LS $ 22,000 $ <br /> Point of Connection to Meter) 22,000 <br /> 38 Construct V Sch 80 PVC Water Line <br /> $ $ <br /> Including Trenching,Removals, 415 LF 75 31,125 <br /> Bedding,and Backfill <br /> 39 Construct 2" Sch 80 PVC Water Line $ $ <br /> Including Trenching,Removals, 115 LF 95 10,925 <br /> Bedding,and Backfill <br /> 40 Install 1"Pressure Reducing Valve in $ $ <br /> Vault 1 EA 5,000 51000 <br /> 41 Install Make-up Water Trough Valve 1 EA $ 12,000 $ 12,000 <br /> 42 Install 2"Backflow Prevention Assembly $ 10,000 $ 10,000 <br /> with Enclosure 1 EA <br /> 43 Construct 12"X12"Catch Basin with $ $ <br /> Atrium Grate(NDS or Approved Equal), 13 EA 3,000 39,000 <br /> Incl.Excavation,Removals,Backfill, <br /> and Risers <br /> 44 Construct Venting Catch Basin and $ $ <br /> Piping Incl.Trenching,Removals, 1 LS 40,000 40,000 <br /> Bedding,and Backfill <br /> 45 Install Drinking Fountain,3/4"Service $ $ <br /> Lateral with Valve,and Drainage Sump 2 EA 12,500 25,000 <br /> with Access Box and Overflow Piping <br /> 46 Construct Asphalt Concrete Pavement 485 SF $ 15 $ 7,275 <br /> P-3 of P-23 <br />