Laserfiche WebLink
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6600 <br /> BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br /> Item Description Qty Unit Unit Price Amount <br /> 47 2"Cold Mill and Overlay $ $ <br /> 3,470 SF 9 31,230 <br /> 48 Install Detectable Warning Surface at 60 SF $ 150 $ 9,000 <br /> Alley <br /> 49 Construct 8"Thick PCC Alley, $ $ <br /> Driveway,Curb,and Gutter Pavement 2,450 SF 45 110,250 <br /> per C.S.A Plan No. 1111. <br /> 50 Construct 8"Thick PCC Longitudinal 4p SF $ 200 $ 8,000 <br /> Gutter <br /> 51 Construct 4"Thick PCC Sidewalk with $ $ <br /> Integral Color 8,460 SF 24 203,040 <br /> 52 Construct 8"Thick PCC Vehicular Rated $ $ <br /> Sidewalk with Integral Color,Curb,and 490 SF 45 22,050 <br /> Curb Opening <br /> 53 Construct PCC Curb Ramp Incl.Curb, $ $ <br /> Gutter,and Detectable Warning Surface 260 SF 140 36,400 <br /> 54 Install Continental Crosswalk Striping. $ $ <br /> Remove and Reinstall Stop Bar,Stop I LS 20,000 20,000 <br /> Marking,and Turn Arrow. <br /> 55 Construct Crushed Miscellaneous Base $ 120 $ <br /> 163 CY 19,560 <br /> 56 Construct 6"Wide Concrete Header 480 LF $ 75 $ 36,000 <br /> 57 Construct Poured-In-Place Rubber $ $ <br /> Surfacing Incl.Base Courses 3,640 SF 27.50 100,100 <br /> 58 Construct Interlocking Concrete Pavers 1,680 SF $ 40 $ 67,200 <br /> Incl.Base Courses <br /> 59 Install Interpretive Signage $ $ <br /> 3 EA 4,000 12,000 <br /> 60 Install Entry Signage $ $ <br /> 2 EA 12,500 25,000 <br /> 61 Install General Park Signage 1 LS $ 10,000 $ 10,000 <br /> 62 Construction Permit 1 LS $19,410 $19,410 <br /> 63 SWPPP Preparation(Risk Level 2)and $ 30,000 $ 30,000 <br /> Implementation 1 LS <br /> 64 Urban Greening Program Funding $ 10,000 $ 10,000 <br /> Acknowledgement Sign 1 EA <br /> 65 Construct Removeable Bollard <br /> 3 EA $ 3,000 $ 9,000 <br /> 66 Install Bench $ 3,000 $ <br /> 10 EA 30,000 <br /> P-4 of P-23 <br />