Laserfiche WebLink
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6600 <br /> BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br /> Item Description Qty Unit Unit Price Amount <br /> 67 Install Picnic Table 4 EA $ 4,500 $ 18,000 <br /> 68 Install Waste Receptacles(Includes $ $ <br /> Trash and Recycle;Furnished by City; 5 EA 1,000 5,000 <br /> Install Only) <br /> 69 Construct Playground Equipment and $ S <br /> Shade Structure 1 LS 265,000 265,000 <br /> 70 Construct Workout Equipment and $ $ <br /> Shade Structure 1 LS 75,000 75,000 <br /> 71 Install Architectural Fencing $ $ <br /> 488 LF 285 139,080 <br /> 72 Electrical Trenching Incl.Bedding and $ S <br /> Backfill 1 LS 75,000 75,000 <br /> 73 Install Electrical Conduit,Wiring,and $ $ <br /> Pullboxes 1 LS 85,000 85,000 <br /> 74 Install 200A NEMA 3R Meter Pedestal, $ $ <br /> Lighting Control Panel in NEMA 3R <br /> Enclosure,NEMA 3R Enclosure for 1 LS 35,000 <br /> Security Camera System,and Concrete 35,004 <br /> Pad <br /> 75 Install 14'Light Pale(includes post, $ $ <br /> footing,luminaire,excavation,and 14 EA 12,000 168,000 <br /> removals <br /> 76 Instal130'Camera Pole(includes post, $ $ <br /> footing,luminaire,cameras,excavation, 2 EA 20,000 40,000 <br /> and removals <br /> 77 Install 30'Sporls Lighting Pole(includes $ $ <br /> post,footing,luminaires,excavation,and 2 EA 19,000 38,000 <br /> removals) <br /> 78 Install Security Camera System $ 55,000 $ <br /> Infrastructure Including Deferred System 1 LS 55,000 <br /> Design by Contractor <br /> 79 Install Landscaping Including Turf, $ $ <br /> Trees,Shrubs,Mulch,Soil Conditioning, <br /> Topsoil,Amendments,Fertilizers, 1 LS 85,000 85,000 <br /> Agronomic Testing,Supports,and Root <br /> Barriers <br /> 80 Install Landscape Boulders $ $ 6,650 <br /> 19 EA 350 <br /> 81 Install Irrigation System Including $ $ <br /> Piping,Tubing,Sleeves,Bubblers, <br /> Control Wiring,Valve Boxes, 1 LS 195,000 195,000 <br /> Controllers,Valves, Sensors,Quick <br /> Couplers,DripRings,Etc. <br /> 82 Plant Establishment(90 Days) $ $ <br /> 1 LS 5,000 5,000 <br /> P-5 of P-23 <br />