My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SULLY-MILLER CONTRACTING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
SULLY-MILLER CONTRACTING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:13:13 AM
Creation date
4/8/2025 3:59:22 PM
Metadata
Fields
Template:
Contracts
Company Name
SULLY-MILLER CONTRACTING COMPANY
Contract #
P11-6741, 19-6499
Agency
Public Works
Council Approval Date
3/4/2025
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> Docusign Envelope ID:91F206F5- 24B-431A-B7E6-95AB3921ADA6 <br /> ADDENDUM No. ONE . <br /> CITY OF SANTA ANA Project 11-6741 <br /> PROPOSAL Project 19-6499 <br /> PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br /> AVENUE TO SAINT ANDREW PLACE <br /> PROJECT NO.: 19-6499 -BRISTOL STREET (PHASE 4)WATER MAIN IMPROVEMENTS <br /> Item Description Qty Unit Unit Price Amount <br /> 12 PCC Curb and Gutter(Type A-2-6) 1,035 LF $ $ <br /> 47.50 49,162.50 <br /> 13 PCC Curb(Type B-1) 4,945 LF $ $ <br /> 33.00 163,185.00 <br /> 14 PCC Median Curb(4") 460 LF $ $ <br /> 32.00 14,720.00 <br /> 15 Colored Concrete for Median Turn Pocket— 2,875 SF $ $ <br /> Brick Red,Topcast Exposed Aggregate <br /> Finish(T=4") 13.50 38,812.50 <br /> 16 Colored Concrete—Brick Red,Topcast 3,740 SF $ $ <br /> Exposed Aggregate Finish(T=6") 23.0 86,020.00 <br /> 17 Concrete Bus Pad 8,970 SF $ $ <br /> 14.00 125,580.00 <br /> 18 Concrete Bus Pad—with Dowels 552 SF $ $ <br /> 36.00 19,872.00 <br /> 19 PCC Protected Bike Lane(6") 805 LF $ $ <br /> 32.00 25,760.00 <br /> 20 Adjust Manhole Frame and Cover to Finished 17 EA $ $ <br /> Grade 2,100.00 35,700.00 <br /> 21 Furnish and Install New Water Valve Frame 7 EA $ $ <br /> and Cover 2,800.00 19,600.00 <br /> 22 Furnish and Install Survey Monument to 1 EA $ $ <br /> Finished Grade 2,200.00 2,200.00 <br /> 23 Adjust Manhole Frame&Cover per OC San 2 EA $ $ <br /> Std. 4,300.00 8,600.00 <br /> 24 Traffic Signal Modification at Bristol St and 1 LS $ $ <br /> Warner Ave 154,000.00 154,000.00 <br /> 25 Traffic Signal Modification at Bristol St and 1 LS $ $ 418,000.00 <br /> Glenwood Pl. 418,000.00 <br /> 26 Traffic Signal Modification at Bristol St and I LS $ $ 167,000.0 <br /> St.Andrew Pl. 167,000.00 <br /> 27 Install 2"PVC Conduit per Plan 250 LF $ $ <br /> 100.00 25,000.00 <br /> 28 Install 3"PVC Conduit per Plan 3,000 LF $ $ <br /> 65.00 195,000.00 <br /> P-2 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.