My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SULLY-MILLER CONTRACTING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
SULLY-MILLER CONTRACTING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:13:13 AM
Creation date
4/8/2025 3:59:22 PM
Metadata
Fields
Template:
Contracts
Company Name
SULLY-MILLER CONTRACTING COMPANY
Contract #
P11-6741, 19-6499
Agency
Public Works
Council Approval Date
3/4/2025
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Doousfgn Envelope ID;91F206F54248431A-B7E6-95AB3921ADA6 <br /> CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br /> AVENUE TO SAINT ANDREW PLACE <br /> PROJECT NO.: 19-6499-BRISTOL STREET(PHASE 4)WATER MAIN IMPROVEMENTS <br /> .Item Description Qty Unit Unit Price Amount <br /> 29 Install 4"PVC Conduit per Plan 440 LF $ $ <br /> 100,00 44,000.00 <br /> 30 Install No. 6 Pull Box 20 EA $ $ <br /> 2,500.00 50,000.00 <br /> 31 Install No.613 Pull Box 8 EA $ $ <br /> 2,500.00 20,000.00 <br /> 32 Install SCE Pull Box 1 EA $ $ <br /> 5,000.00 5,000.00 <br /> 33 Install Traffic Signal Loop Detector(Type E 12 EA $ $ <br /> Loop) <br /> 1,000.00 12,000.00 <br /> 34 Install CCTV&1P Communication System I LS $ $ <br /> 35,000.00 35,000.00 <br /> 35 Install 144 Strand SMFO Cable 3,700 LF $ $ <br /> 10.00 37,000.00 <br /> 36 Install 12 Strand SMFO Cable 200 LF $ $ <br /> 10.00 2,000.00 <br /> 37 Fusion Splice 1 Shand of Single Mode Fiber 156 EA $ <br /> (SMFO) 100.00 15,600.00 <br /> 38 Install Fiber Optic Splice Closure l EA $ $ <br /> 5,000.00 5,000.00 <br /> 39 Pothole Traffic Signal Pole Location for 12 EA $ $ <br /> Utility Conflicts 3,000.00 36,000.00 <br /> 40 Temporary Overhead Wiring at Traffic 1 LS $ $ <br /> Signals 46,000.00 45,000.00 <br /> 41 Street Lighting Installation 1 LS $ $ 747,000.00 <br /> 747,000.00 <br /> 42 8"PVC Class 305(DR 14)C900 Pipe 1,300 LF $ $ <br /> 350.00 455,000.00 <br /> 43 12"PVC Class 305(DR 14)C900 Pipe 2,700 LP $ $ <br /> 435.00 1,174,500.00 <br /> 44 1"Copper Water Service 14 EA $ $ <br /> 7,000.00 98,000.00 <br /> 45 2"Copper Water Service 1 EA $ $ <br /> 21,000.00 21,000.00 <br /> P-3 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.