My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-04-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/15/2025
>
Agenda Packet_2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:50:36 PM
Creation date
4/9/2025 2:42:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/15/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description of Deliverables and Implementation Plan <br /> Deliverables <br /> 1. Talent Roster and Pricing: Comprehensive listing of available talent grouped by pricing tiers, including <br /> regional Mexican artists and artists across other genres. <br /> 2. Event Concept Proposal: Tailored event themes, layouts, and designs. <br /> 3. Production Schedule: Detailed timeline for all phases of the event, including setup, execution, and <br /> tear-down. <br /> 4. Marketing Materials: Professionally designed graphic collateral for social media, print, and digital <br /> campaigns. <br /> 5. Post-Event Report: Summary of attendance, community feedback, budget analysis, and <br /> recommendations for future improvements. <br /> Implementation Plan and Timeline <br /> 1. Phase 1: Planning (Weeks 1–4) <br /> ○ Assign Project Manager and initiate stakeholder meetings. <br /> ○ Finalize talent selection and budget approval. <br /> ○ Develop marketing strategy and event branding materials. <br /> 2. Phase 2: Logistics and Marketing (Weeks 5–8) <br /> ○ Coordinate with vendors, technical teams, and City departments. <br /> ○ Launch promotional campaigns to maximize community engagement. <br /> 3. Phase 3: Pre-Event Preparation (Weeks 9–10) <br /> ○ Conduct site inspections and finalize production schedules. <br /> ○ Manage equipment setup and vendor coordination. <br /> 4. Phase 4: Event Day Execution (Week 11) <br /> ○ Oversee on-site operations, including talent management, attendee engagement, and <br /> troubleshooting. <br /> 5. Phase 5: Post-Event Evaluation (Week 12) <br /> ○ Conduct debriefing with stakeholders and submit post-event reports. <br /> GTE Agency, LLC DBA Global Talent Entertainment | Talent Agency License #1001218011 <br /> www.globaltalentent.com | 562-544-1764 | contact@gobaltalentent.com | 3780 Kilroy Airport Way, Suite 200, Long Beach, CA 90806 <br /> 11 <br /> <br /> <br />City Council 16 – 76 4/15/2025
The URL can be used to link to this page
Your browser does not support the video tag.