My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERIOR DEMOLITION, INC. (4)
Clerk
>
Contracts / Agreements
>
I
>
INTERIOR DEMOLITION, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:38:24 AM
Creation date
4/29/2025 10:35:05 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERIOR DEMOLITION, INC.
Contract #
A-2025-047-03
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
activities. This will always be coordinated with HAQ]k in advance, <br /> RVI's will be issued as needed if questions or scope issues arise during the course of <br /> the demolition activities. Field activities related to any RH's will riot incur until an <br /> appropriate answer has been provided, <br /> 3.1 PRE-STRUCTURAL DEMOLITION ACI'IVITIES <br /> AS needed, ID1 will use Bobcat skid steer loaders and hand labor to remove all soft <br /> debris that is not easily separated from the concrete material. This includes removal of <br /> roofing, ceilings, HVAC ducts, insulation, plaster partition walls, lights and all other <br /> building components. <br /> Fences will be installed around the trees that are to remain as per the plans in order Io <br /> protect therm from any damage during the demolition. In addition, they will be <br /> watered weekly, every Friday at Barn utilizing our water truck that is perrna nently on <br /> site, <br /> 3.2 ABOVF SURFACE DEMOLMON <br /> JDl will begin the above surface demolition after the asbestos and le-ad abatement has <br /> been completed and as dernolition progresses, IDI will use Bobcat skid steer loaders <br /> and hand labor to separate the wood, metal, and roof materials in order to transport <br /> them to a recycling facility. Roof, containing concrete will be transported with the clean <br /> concrete to a recycling facility. The wood mixed with trees and shrubbery will be <br /> recycled to be used as combustible. <br /> IDI will utill7e excavators and Hack loaders equipped with special demolition <br /> cttachments (Le, hydraulic breakers, hydraulic shears, and grapples) to demolish thesc., <br /> structures, The use of 101's excavators increases the efficiency of the dernolilion <br /> process and allows a more controlled operation than conventional crane. and ball <br /> wrecking procedure. Demolition will begin from the top working down and from ane <br /> end of the building working towards the other end. Excavators and loaders will <br /> systematically demolish the building structure and process the demolition debris. <br /> Derriolition debris will be segregated -cmd stockpiled for proper disposition. <br /> 3.3 SUB-SURFACE DEMOLITION <br /> Sub-surface demolition will consist primarily of removal of building slabs, and footings. <br /> W1 will iise EALaWltOrS to df=AlOfish the concrele dov,,i) to slab or adjacent gradc <br /> cdevatioi), Track loaders ryiey @ssist w7ih debris femoval, pfocessinp, stockpiling sari <br /> loa(firlp Y;Ibs and, fnc1iFQ?S VAI; 1)r, 'A6G 0?1 41 PIS: C% F)M(eS�Sed dfld hiMied off siie fOr <br /> 3,4 FERROUS AND NONA FRR(--W.S MHALS RH YCI li'1116 <br /> ['10f ilflp, det'1101hJ011 Of the c:'Asiiilg hoilditig sit ut am, I lf.: CIC n <br /> debris ICE i ec--V( le pis i n u ch rn 01�-I IT,a t(=f iO I i"S [10 ';I I)le. St I LJ(J U 1 5 Or� t�)r 11 if 1p, a I <br /> Jelllt(";Iti lop. 4ri teff-' (oppe: tubir.p" Olt-cif if-al <br />
The URL can be used to link to this page
Your browser does not support the video tag.