Laserfiche WebLink
electrical gear, controls etc., will be separated prior to the demolition as rT)uch as <br /> possible, All metal materials recyried as part of this project will be docil M- ented with <br /> weight tickets which will be provided to HACLA. I hese materials will be hatiled to the <br /> following recycling facilities: <br /> Ecology Recycling <br /> Santa Fe Springs <br /> 3.5 CONCRETE AND ASPHALT RECYCLING <br /> Clean concrete debris from the demolition activities will be stockpiled and then <br /> shipped off for re-cycling. All concrete and asphalt that is hauled off the project site <br /> will be recycled and tickets will be provided to LACCD. This type of recycling does not <br /> get weighed but each end dump load we haul off is equivalent to 20 tons. The owner <br /> will be provided trucking tickets that show the number of loads. <br /> As of this writing all concrete material will be shipped to <br /> Arcadia Reclamation <br /> 1270 Arrow Hwy <br /> Irwindale, CA <br /> 3.6 DEMOLITION DEBRIS DISPOSAL <br /> All demolition debris that will riot be recycled by ID1 will be loaded into semi-end <br /> dumps and hauled to a disposal facility for further recycling or landfill. Jhe end- durrips <br /> will be covered prior to leaving the site. 80% by weight of the construction and <br /> demolition debris he diverted from landfills by a combination of recycling and re-use. <br /> 'This includes interior soft debris (Le, drywall, plaster, ceiling tiles, roofing material, <br /> etc.). Demolition debris will be hauled to the following disposal facilities: <br /> Azusa Land Reclamation <br /> 1211 W Gladstone St <br /> Azusa CA <br /> 33 SWPPP <br /> Interior Demolition, Inc. will maintain all SWPPP requirements. This includes but is not <br /> limited to BIVIP's, shaker plates and straw waddles. <br /> 4 1 DUS] (ON)1`101. <br /> U will control dust generation with physical bat T iors (such as perimeter fencing with <br /> windscreen) and/or soil wetting. rxcavation areas shail be sectried and water will be <br /> Used to control any fugitive dust from blowing onto other properties. The Site will be <br /> (Iontrolled and no excavation will be coriductr-d in limes of high wind conditions (e.g, <br /> vJndspced in extcs of 25 miles per hour). U11,weTse will t..ondtici air m.-nitaring a-t <br /> Site periw�,tvr and vvoi 1� areas <br />