Laserfiche WebLink
I he water will be available via a water truck or a metered discharge from a fire <br /> hydrant located proximate to the Site. IDJ will control dust generation by spraying <br /> water prior Lo daily work activities, during excavation/loading activities (as necessary <br /> to maintain concentrations below action levels), and at truck staging locations. <br /> Watering equipment will be continuously available to provide proper dust CDI)V-Dl. <br /> We will also be using wet methods during all demolition practice to insure worker <br /> safety for silica. <br /> PROJECT MANAGER MARCO MOLINA (818) 262 -1611 <br /> SAFETY OFFICER NICK ANDRUS (626) 510 - 3034 <br />