My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J&G INDUSTRIES, INC.
Clerk
>
Contracts / Agreements
>
J
>
J&G INDUSTRIES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:45:28 AM
Creation date
4/29/2025 10:43:05 AM
Metadata
Fields
Template:
Contracts
Company Name
J&G INDUSTRIES, INC.
Contract #
A-2025-047-04
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
10/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&G's assigned PM will first manage the services that are required to be performed within 24 <br /> hours of CTO execution. If required, fencing and boarding will be installed to secure the site. <br /> All necessary notices, ordinances, statues of rules, laws and regulations shall be followed in <br /> the performance of the CTO. Notifications/permits may include: city grading, city demolition, <br /> city sewer capping, Orange County Health Care Agency (OCHCA) tank closure, OCHCA water <br /> well closure, OCHCA monitoring well closure, South Coast Air Quality Management District <br /> (SCAQMD) demolition, SCAQMD asbestos abatement, SCAQMD VOC containing tank or soil <br /> abatement, OSHA excavation, OSHA falsework, OSHA over height, and OSHA scaffolding. <br /> The PM will direct J&G's consultant to prepare a Notice of Intent(NOI) to comply with the <br /> terms of the general permit to discharge storm water associated with construction activity, for <br /> sites that are one acre or larger in size. The PM will submit the NOI and permit fee to the State <br /> Water Resources Control Board. When required, the PM will direct J&G's consultant to <br /> prepare a Construction Storm Water Pollution Prevention Plan (SWPPP), or an erosion control <br /> plan. Storm water best management practices will be implemented as needed for compliance <br /> with the SWPPP/Erosion Control Plan, Rat and vermin inspections, and bee colony <br /> inspections to be performed as necessary. <br /> A site specific Health & Safety Plan will be prepared for the project. The FS will conduct weekly <br /> tailgate Health &Safety meetings to cover health and safety Issues with field workers. J&G's <br /> consultant will periodically conduct site safety inspections. Results are given to the PM for <br /> directing changes. <br /> Underground Service Alert will be contacted to have the location of utilities marked. The PM <br /> shall contact utility companies to coordinate any required utility terminations. Where required, <br /> sewer capping will occur at the beginning of work. The FS will be on site at the time the agency <br /> is scheduled to Inspect the utility termination. <br /> Care shall be taken to perform the services so as not to endanger the safety or any person or <br /> property. At the start of the CTO, the FS will visually survey existing improvements and utilities <br /> near the work site, In order to protect them from damage. FS will also visually survey the site <br /> for potential materials containing regulated/hazardous wastes. The PM will contact SA of any <br /> findings. <br /> J&G Industries <br />
The URL can be used to link to this page
Your browser does not support the video tag.