My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J&G INDUSTRIES, INC.
Clerk
>
Contracts / Agreements
>
J
>
J&G INDUSTRIES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:45:28 AM
Creation date
4/29/2025 10:43:05 AM
Metadata
Fields
Template:
Contracts
Company Name
J&G INDUSTRIES, INC.
Contract #
A-2025-047-04
Agency
Planning & Building
Council Approval Date
4/15/2025
Expiration Date
4/14/2028
Insurance Exp Date
10/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As directed by SA, the PM will arrange for J&G's consultant to perform an asbestos and lead- <br /> based paint survey and an abatement plan for asbestos and lead containing materials removal <br /> and disposal. When an asbestos and lead-based paint survey has been previously prepared, <br /> the PM will arrange for J&G's subcontractor to prepare an abatement plan. The abatement <br /> plan will be submitted to the SCAQMD for their approval if required.The PM shall confirm that <br /> all required licenses, permits and certifications have been acquired for implementing the <br /> abatement plan. The PM will submit the SCAQMD approved abatement plan for SA's approval <br /> to proceed with its implementation. Upon SA's approval, J&G's abatement subcontractor will <br /> implement the abatement plan. FS will verify waste is properly manifested for disposal at a <br /> proper facility. <br /> Upon completion of abatement plan implementation,the FS will conduct a pre-demolition <br /> survey to identify: that the asbestos, lead, regulated and hazardous wastes have been <br /> removed as per their abatement plans; verify monitoring records; verify proper manifesting of <br /> waste disposal; visually verify no other hazardous materials are left in the demolition area; as <br /> required, verify site is secured by appropriate fencing; verify that appropriate protection <br /> devices are in place, such as pedestrian canopy; verify appropriate signing displayed (ie: no <br /> trespassing, keep out demolition in progress, danger, etc.); verify all utilities have been <br /> terminated; and erosion control measures are in place, as needed and required. The FS will <br /> use a checklist to complete the pre-demolition survey. The FS will confirm with the PM that the <br /> demolition area is ready for demolition. Structures ready for demolition will be clearly marked <br /> "CLEAR FOR DEMO J&G", <br /> FS will direct crews In: structure demolition; improvements demolition; salvaging procedures; <br /> solid waste clearing and disposal.Where practical, concrete, asphalt, steel, nonferrous <br /> metals, and wood will be segregated and sent off site for recycling. The site will be backfilled, <br /> graded and a minimum of V base material will be placed over entire lot with sand bags/wattles <br /> at perimeter, FS will review fieldwork daily for compliance with CTO specifications and record <br /> findings in a quality control log. <br /> Field personnel are trained to stop work upon discovery of suspect asbestos, regulated or <br /> hazardous waste. The FS will contact the PM,who in turn will contact SAA. The FS shall leave <br /> the work site in a clean and neat condition, upon completion of the CTO. The PM will notify <br /> those agencies required for final inspections and sign offs. <br /> J&G Industries <br />
The URL can be used to link to this page
Your browser does not support the video tag.