Laserfiche WebLink
B. PREPARE AND FILE "RECORD DRAWINGS" <br />PENCO Engineering, Inc. shall prepare and submit Record Drawings of <br />civil work after construction is completed. The contractor shall provide a <br />redline markup of changes made during construction and any field data <br />needed to correctly reflect the as -built condition. <br />I. SCOPE EXCLUSIONS <br />C. Right -of -Way acquisition; including legal descriptions and exhibits. <br />D. Structural designs. <br />E. Landscaping and irrigation. <br />F. Electrical designs. <br />G. Dry utilities. <br />H. Potholing. <br />I. Permit application fees. <br />J. Underground utility main relocation. <br />P:\2008\02344.00 - City of Santa Ana OnCall\Attachment A\Civil Engineering Scope of Services.5.20.08.doc <br />