Laserfiche WebLink
other related issues will be discussed and any technical problems resolved <br />at the meetings. <br />We will, at or before our meetings, supply four (or more if needed) copies <br />of all completed reports, studies, plans, specifications, and estimates, <br />which are ready for submittal. <br />We will update the project schedule using Microsoft Project format and <br />submit it to the City for approval. The Progress Reports shall be <br />submitted at monthly intervals, indicating progress achieved during the <br />reporting period in relation to the progress scheduled. We will provide <br />the Project Manager with a copy of a Progress Report on a monthly basis <br />or at least two working days before a scheduled meeting. <br />A. MEETINGS <br />PENCO Engineering, Inc. will attend the Pre -Bid Meeting and meet with <br />the City, as needed, during the bidding process. <br />B. PREPARE ADDENDA AND PLAN CLARIFICATION <br />PENCO Engineering, Inc. will be available to answer questions from <br />prospective bidders. If necessary, PENCO has allocated time to assist the <br />City in the preparation of Addenda. <br />V. CONSTRUCTION SUPPORT <br />PENCO Engineering, Inc. will provide any appropriate technical services during <br />the construction phase of the project, including but not limited to, consultation, <br />plan interpretation (RFI's), and plan revisions resulting from changed conditions. <br />Such revisions will be completed in a timely manner so as to avoid or minimize <br />construction delays. In the event that plan revisions are required during <br />construction, for other reasons than errors or omissions, they shall be considered <br />extra work and additional compensation will be based on the hourly rates <br />established per this proposal. PENCO Engineering, Inc. assumes a total of four <br />(4) meetings or eight (8) hours in our estimate. <br />AS -BUILT DRAWINGS <br />A. JOB WALK, PUNCH LIST AND FINAL WALK THROUGH <br />PENCO Engineering, Inc. shall perform a job walk near the completion of <br />the project. PENCO will provide a punch list and review with the Client. <br />Perform a final completion walk through and review completion or <br />omission of punch list items with client. <br />P:\2008\02344.00 - City of Santa Ana OnCall\Attachment A\Civil Engineering Scope of Services.5.20.08.doc <br />