My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - ON-CALL LANDSCAPE SRVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
03/02/2009
>
25B - AGMT - ON-CALL LANDSCAPE SRVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:22:55 PM
Creation date
2/24/2009 3:29:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
3/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Santa Ana Zoo Front Entrance <br />February 4, 2008 <br />Page 2 <br />1.08 Preliminary Budget -Prepare Preliminary Statement of Probable Construction Costs <br />1.09 Assist in one (1) Client Meeting <br />1.10 Prepare Tree removaUTree protection information <br />1.11 Allow for one (1) plan revision per Client/City comments <br />1.12 Attend maximum of one (1) Project design/review meetings (in addition to kick-off meeting) via phone <br />conference <br />TASK 2 - Des[gn Development Phase: <br />2.01 Revise base files <br />2.02 Coordination with Architect, Mechanical, Electrical and Civil Engineers to provide on-structure, <br />landscape drain connections to structural slab drains and/or curb drains; and water stub-outs/P.O.C. for <br />irrigation system <br />2.03 Prepare Preliminary Irrigation layout/coordination <br />2.04 Prepare Preliminary Planting Plans with major plant material types and locations identified <br />2.05 Refinement of Statement of Probable Construction Costs <br />2.06 Prepare Outline specifications in City of Santa Ana format <br />2.07 Allow for one (1) plan revision per Client comments <br />2.08 Attend maximum of one (1) Project Team/Client Meeting <br />TASK 3 -Construction Documents: <br />3.01 Prepare Irrigation Plans detailing automatic irrigation system indicating location and type of backflow <br />prevention, mainlines, laterals, heads, valves, quick couplers and automatic controllers <br />3.02 Prepare Irrigation Schedules/Calculations and Details <br />3.03 Prepare Planting Plans identifying plant call-outs and planting details <br />3.04 Prepare Planting Details <br />3.05 Prepare finalized technical specification for irrigation, planting and landscape maintenance <br />3.06 Coordinate utility information with Team <br />3.07 Implement In-house QA/QC procedures <br />3.08 Respond to Client comments <br />3.09 Attendance at a maximum of one (1) project reviewlcoordination meeting <br />25B-74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.