Laserfiche WebLink
City of Santa Ana <br />Santa Ana Zoo Front Entrance <br />February 4, 2008 <br />Page 3 <br />Construction Documents Summary: <br />L-1 Irrigation plan (1"=20') <br />L-2 Irrigation details and calculations <br />L-3 Planting plan (1"=20') <br />L-4 Planting Details <br />• Specifications (City forma#) <br />• Soil testing, evaluation by Wallace laboratories <br />• Arborist Report to be provided by City of Santa Ana if required <br />TASK 4 -Bidding: <br />4.01 Assist the team in preparation of bid packages <br />4.02 Attend pre-bid meeting <br />4.03 Assist response to bidder's RFl's <br />4.04 Assist in preparing addendums <br />TASK 5 -Construction Administration (6 Site and/or Nursery Visits): <br />5.01 Attend construction kick-off meeting (1) <br />5.02 Process product submittals/shop drawings <br />5.03 Attend periodic construction reviews (allow 2) <br />5.04 Construction administration meetings (allow 1) <br />5.05 Assist preparation of change orders <br />5.06 Assist preparation of RFI's <br />5.07 Prepare final punchlist prior to commencement of maintenance period (1 visit) <br />5.08 Review end of maintenance review (1 visit) <br />5.09 Prepare as-built plans <br />5.10 Prepare project close out <br />25B-75 <br />