Laserfiche WebLink
MARCH 23, 2009 <br />PAGE 16 OF 17 <br />95. Prior to issuance of grading permits, the project developer <br />shall coordinate with Southern California Gas to determine the <br />exact location of all underground natural gas facilities. All <br />gas pipelines and associated structures to be left on the <br />project site must be protected from damage. <br />96. Prior to issuance of grading permits, the <br />shall coordinate with Adelphia Communication <br />exact location of all underground cable <br />developer shall protect all existing <br />associated structures to be left on the <br />damage. <br />project developer <br />is to determine the <br />facilities. The <br />cable lines and <br />project site for <br />97. Prior to issuance of grading permits, the project developer <br />shall coordinate with SBC Communications (formerly Pacific <br />Bell) to determine the exact location of all underground <br />telephone facilities. The developer shall protect all <br />existing telephone lines and associated structures to be left <br />on the project site from damage. <br />98. Prior to issuance of grading permits, the project developer <br />shall demonstrate to the City of Santa Ana that construction- <br />related waste generated on-site would be recycled wherever <br />feasible as the first choice of disposal method, leaving the <br />option of landfill disposal as a last alternative. The <br />proposed commercial uses shall incorporate facilities for <br />collection and pick-up of recyclable materials into the design <br />of the project. <br />99. Prior to issuance of grading permits, the project developer <br />shall coordinate with the Santa Ana Water Division to <br />determine the exact location of all existing underground water <br />supply facilities and take action to prevent damage to these <br />facilities to be left on the project site or interfere with <br />their operation. The project developer shall pay their fair <br />share amount for the necessary facilities to accommodate <br />project-related water supplies. <br />100. Prior to issuance of building permits, the existing eight-inch <br />sewer line along Hutton Centre Drive north of Sandpointe <br />Avenue, shall be replaced with a new 10-inch sewer line. <br />101. Prior to issuance of grading permits, the project developer <br />shall coordinate with Waste Management on the type and <br />location of facilities needed to provide solid waste disposal <br />service to the project site. <br />75A-110 <br />