My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/04/2009
>
75A - PH MACARTHUR PLACE SOUTH - SKYLINE TOWERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:21:17 PM
Creation date
4/29/2009 12:56:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
5/4/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARCH 23, 2009 <br />PAGE 17 OF 17 <br />102. Prior to issuance of grading permits, the project developer <br />shall perform soil testing to determine is soil to be <br />excavated from the site will require off-site disposal. If <br />the soil is found to be contaminated, it will be properly <br />disposed of in compliance with California environmental laws, <br />regulations and policies. <br />B. Police Department <br />1. A security plan must be submitted to the Police Department at <br />the plan check stage for approval. The plan must cover all <br />aspects of the projects security including security personnel, <br />surveillance equipment, and hardware. The project will be <br />required to have a minimum of four state licensed uniformed <br />security personnel. One security officer will be required for <br />each building, one for the podium level and one for the <br />parking garage. <br />2. A minimum 12-inch shatterproof convex mirror shall be <br />installed at each stair landing. All doors leading into <br />stairwells shall be equipped with a minimum 5-inch by 20-inch <br />fire rated window. The last flight of stairs shall be fully <br />enclosed at its base. <br />3. The City of Santa Ana parking structure design standards shall <br />be followed in its entirety. Duress alarms allowing voice <br />communication with security personnel shall be placed in <br />strategic locations, approved by the Police Department, <br />throughout the parking garage. <br />4. All project walkways shall be illuminated to a minimum <br />maintained one footcandle of light. <br />5. All elevators serving the residential component of the project <br />shall be equipped with card readers at the garage levels to <br />restrict unauthorized access into the residential towers. The <br />elevator lobbies shall be designed and constructed of material <br />that allows maximum visibility of the interior of the lobby <br />from the parking decks. Glazing material will be used to its <br />maximum extent. <br />75A-111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.