Laserfiche WebLink
A- 2008 -285 <br />C� <br />O <br />CONSTRUCTION AND MAINTENANCE AGREEMENT <br />RAIL - HIGHWAY CROSSING SAFETY ENHANCEMENTS AND <br />SAFETY MEASURES RELATED TO QUIET ZONE IMPLEMENTATION <br />FOR THE CITY OF SANTA ANA <br />SCRRA File No. I G0000741 <br />SCRRA Project/Task Nos. 186055 7 <br />This Construction and Maintenance Agreement ( "AGREEMENT ") is made and entered <br />into on this 2p-t� day of 6e- 'l6Q6,e r, 2008, by and between the City of Santa <br />Ana, a charter city and municipal corporation duly organized and existing under the <br />Constitution and laws of the State of California, hereinafter referred to as the "CITY", and <br />the SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY, a joint powers authority <br />existing under the laws of the State of California, hereinafter referred to as "SCRRA ": <br />RECITALS <br />SCRRA is a five - county joint powers authority, created pursuant to California Public <br />Utilities Code Section 130255 and California Government Code Section 6500 et seq., to <br />build, maintain and operate the "METROLINK" commuter train system. The five - county <br />member agencies are comprised of the following: Los Angeles County Metropolitan <br />Transportation Authority ( "METRO "), Ventura County Transportation Commission <br />( "VCTC "), Orange County Transportation Authority ( "OCTA "), San Bernardino Associated <br />Governments ( "SANBAG "), and Riverside County Transportation Commission ( "RCTC "). <br />SCRRA builds, operates, and maintains a commuter rail system in the five - county area <br />on rail rights -of -ways owned by the member agencies. For this project, the owner of the <br />rail right -of -way is the OCTA. <br />In May 2005, OCTA authorized the Grade Crossing Safety Program ( "PROGRAM "). This <br />Program was based on a report entitled "Grade Crossing Study ", prepared by Korve <br />Engineering, for OCTA, in December 2003. The Grade Crossing Study recommended <br />safety enhancements to 64 at -grade crossings in Orange County. Subsequent to this <br />Grade Crossing Study, OCTA separated 12 grade crossings located in the City of <br />Placentia from further study because the City of Placentia already had a process in place <br />to enhance and improve the crossings for quiet zone purposes. In April 2006, SCRRA, <br />OCTA, the California Public Utilities Commission ( "CPUC ") and the Participating Cities as <br />identified in the Grade Crossing Study began field diagnostic meetings at each of the at- <br />grade crossings within the program. The diagnostic meetings were completed in <br />November of 2006, and SCRRA produced exhibits for these fifty -two (52) crossings <br />(including a private crossing) showing the scope of the improvements. Upon completion <br />of these exhibits, the SCRRA Staff convened for a series of three (3) meetings, the <br />Grade Crossing Safety Enhancement Project Page 1 of 14 Construction and Maintenance Agreement <br />City of Santa Ana <br />