My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCHANTS LANDSCAPE SERVICES 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MERCHANTS LANDSCAPE SERVICES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 4:53:03 PM
Creation date
8/14/2009 8:39:50 AM
Metadata
Fields
Template:
Contracts
Company Name
MERCHANTS LANDSCAPE SERVICES
Contract #
A-2009-053
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
5/18/2009
Expiration Date
6/30/2010
Insurance Exp Date
7/1/2010
Destruction Year
2015
Notes
Amended by A-2009-170, A-2009-193, A-2010-098, A-2011-043
Document Relationships
MERCHANTS LANDSCAPE SERVICES 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2C
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES, INC. 2D
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined <br />to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of <br />Santa Ana or the SAPRF. <br />2.09 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., Monday <br />through Friday. No work shall be performed on weekends or on City recognized holidays <br />without written SAPRF approval. <br />2.10 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for Public <br />Works Construction, latest edition, hereinafter referred to as Standard Specifications. In case <br />of conflict between the Standard Specifications and this Specification, this Specification shall <br />take precedence over and be used in lieu of such conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not complete <br />detail, it is understood that workmanship of the finest quality is to be used. Unless otherwise <br />specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and <br />do all the work involved in executing the contract. <br />2.11 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment and the <br />protection of the public from injury and damage from such equipment. <br />2.12 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal <br />combustion engine used for any purpose on the job or related to the job shall be equipped with <br />a muffler of a type recommended by the manufacturer of such equipment. No internal <br />combustion engine shall be operated on the project without said muffler. Full compensation for <br />conforming to the requirements of this section shall be considered as included in the prices paid <br />for the various contract items of work involved and no additional compensation will be allowed <br />therefore. Sounds, such as loud music, that are not related to the project, shall be kept at levels <br />so as to not disturb the general public. <br />2.13 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work at <br />least five (5) days before work is begun. The Contractor shall cooperate with loca'L authorities <br />relative to handling traffic through the areas and shall make arrangements relative to keeping <br />the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether <br />empty or loaded, shall in all cases yield to public traffic. All traffic delineation and work area <br />protection shall conform to the Work Area Traffic Control Handbook (W.A.T.C.H.) 2000 <br />Edition. <br />The Contractor shall make every effort to keep commercial driveways open during working <br />hours. Should this not be possible, Contractor shall coordinate with the property owners <br />affected to insure that designated times of ingress and egress is available. After working hours, <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.