My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:07:54 PM
Creation date
11/20/2009 10:27:41 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS BUILDING TECHNOLOGIES
Contract #
A-2009-144
Agency
PUBLIC WORKS
Council Approval Date
9/8/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />• Provide engineering as needed for the installation of these units. <br />Roof Mounted Ice Bear System Installation at the Corporate Yard <br />Total price for this portion of the Work is $50,800 <br />Provide and install an Ice Bear System at the Corporate Yard <br />• Contractor shall certify that new ICEBEAR air conditioner shall meet structural en- <br />gineering earthquake requirements to install the ICEBEAR water/ice storage unit on <br />the roof of the Fleet Building at the Corporation Yard. <br />Exclusions <br />This proposal assumes Ice Bear mounting location without building modification, on <br />either 1) the Fleet Department air conditioning equipment area on the roof, or 2) the <br />lower east mezzanine roof area. If the structural and seismic engineering study de- <br />termines that neither location is suitable for mounting the Ice-bear system, it will be <br />located at ground level on the east side of the Fleet Building. Repair of any dam- <br />aged structural members caused by water, termites or any other unknown damage <br />to existing members. <br />If a suitable location cannot be determined, the ICEBEAR will not be installed and <br />City the agreement pricing will be reduced accordingly, in the amount of $50,800. <br />TABLE 1: CURRENT EQUIPMENT LIST (UNITS WILL BE REPLACED WITH CARRIER R- <br />410A MODEL) <br />LGC&I?tt ? ;, T#rtrlay <br /> <br />Fire Station # 4 Carrier 48TJD008-511 GA Gas-Electric 7.5 1 <br />Fire Station # 4 Carrier 48SS-030040311 Gas-Electric 2.5 1 <br />Fire Station # 4 Carrier 48SS-042060xxx Gas-Electric 3.5 1 <br />Fire Station # 4 Carrier 48SS-042060521AA Gas-Electric 3.5 1 <br />Fire Station # 6 Lennox GCS3-411-120 Gas-Electric 4 2 <br />Fire Station # 9 Carrier 48NLT036 Gas-Electric 3 4 <br />Fire Station # 9 Carrier 48NLT048 Gas-Electric 4 1 <br />Corporate Yard/ Lennox GCS16-1353-270-7G Gas-Electric 10 1 <br />Fleet
The URL can be used to link to this page
Your browser does not support the video tag.