My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:07:54 PM
Creation date
11/20/2009 10:27:41 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS BUILDING TECHNOLOGIES
Contract #
A-2009-144
Agency
PUBLIC WORKS
Council Approval Date
9/8/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />Corporate Yard/ <br />Warehouse <br />carrier 48TCDA08A1A6-OAOAO <br />Gas-Electric <br />7.5 <br />1 <br />SW Senior Cen- <br />Carrier 48TCDA08A1A6-OAOAO <br />Gas-Electric <br />7 <br />5 <br />4 <br />ter . <br />SW Senior Cen- <br />Carrier 48TCLA06A1A6-OAOAO <br />Gas-Electric <br />5 <br />2 <br />ter <br />Bowers Museum Carrier 48TCLA05A1A6-OAOAO Gas-Electric 4 1 <br />Bowers Museum Carrier 48TCDA08A1A6-OAOAO Gas-Electric 7.5 1 <br />Assumptions for work listed above <br />• Asbestos abatement to be done by the City in advance of the Work proceeding. <br />• Work to be done during normal hours. <br />• Installation work to be in accordance with Prevailing Wage requirements for area. <br />Exclusions <br />The items listed below are not included in the Work and have not been included in the <br />price. As the Work advances, Contractor and the City may agree to expand the Work and <br />increase the price to include the items listed below (except for the abatement and removal <br />of hazardous materials). <br />• There is no provision to modify the existing housekeeping pads unless specifically <br />outlined in this scope of work <br />There is no hazardous material (asbestos, lead paint, mold etc.) material abatement <br />or removal included in the Work. City is responsible for abatement. Hazardous <br />areas are assumed to have been tagged. <br />• Contractor will not provide painting and patching beyond what is specifically de- <br />scribed in this scope of work. <br />• Contractor is not responsible for temporary cooling. <br />• Contractor is not responsible for repair of any faulty or non-code wiring. <br />• Contractor is not responsible for repair or replacement of existing duct work. <br />• The Scope of Work assumes strengthening of the existing roof structure will not be <br />required. Strengthening of the roof structural members, if required, is considered an <br />additional service.
The URL can be used to link to this page
Your browser does not support the video tag.