Laserfiche WebLink
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />• Contractor is not responsible for repair of any damaged structural members caused <br />by water, termites or any other unknown damage to existing members. <br />1.1.3. Mechanical Upgrades <br />Total price for this portion of the Work is $155,837 <br />Ross Annex - Convert Inlet Guide Banes Control to Variable Frequency Drives Control <br />• Field supply and install VFD's on supply and exhaust fans for Trane Intellipak units <br />AC-1, 2, and 3 <br />• Field supply and install new main processor board, control cards, static pressure <br />sensors and communication cable in units <br />• The units will be UL recertified after the modifications are completed. <br />• Following installation, Contractor shall perform a certified Air Balance of the Sys- <br />tem. Contractor shall not be responsible for corrective measures. <br />Assumptions for Work listed above <br />• Asbestos abatement to be done by the City. <br />• Work to be done during 2nd shift, or weekends if necessary. <br />• Do not include provisions for temporary cooling <br />• Installation work to be in accordance with Prevailing Wage requirements for area. <br />Exclusions <br />The items listed below are not included in the Work and have not been included in the <br />price. As the Work advances, Contractor and the City may agree to expand the Work and <br />increase the price to include the items listed below (except for the abatement and removal <br />of hazardous materials). <br />• There is no provision to modify the existing housekeeping pads unless specifically <br />outlined in this scope of work <br />• There are no hazardous materials (asbestos, lead paint, mold etc.) addressed with- <br />in the Work. City is responsible for abatement work. Hazardous areas are assumed <br />to have been tagged. <br />• Contractor will not provide painting and patching beyond what is specifically de- <br />scribed in this scope of work. <br />• Contractor is not responsible for repair of any faulty or non-code wiring <br />• Contractor is not responsible for repair or replacement of existing duct work.