Laserfiche WebLink
Exhibit A <br />Scope of Work City of Santa Ana Siemens Building Technologies, Inc. Phase II <br />• Santiago Park <br />• Stadium <br />Scope of Work: <br />Memorial Park <br />• Furnish and install new 480 volt, Nema 3R, free standing meter/main section. <br />• Install new feeder to area of MSB-1 to re-feed lighting loads for TOU service. <br />• New lighting feeder on TOU rate to be time clock controlled. TOU loads to be <br />opened by time clock during daylight hours and closed to allow power at dusk to <br />dawn hours. <br />• TOU metered loads must originate in Equipment room containing MSB-1. <br />• Removal and Patch of existing asphalt areas is included. <br />Assumptions <br />• Work to be done during regular hours <br />• Assumes Edison approves design to add raceway and tap feed from existing Edi- <br />son transformer vault. <br />• Feeder conductors type is at discretion of Briggs Electric, Inc. and will be code <br />compliant. Gear type and brand is assumed at discretion of Briggs Electric, Inc. <br />• Assumes new section can be installed adjacent to existing service. <br />• Assumes new gear as required in existing Equipment room containing MSB-1, may <br />be installed on exterior or equipment room if space and clearance is an issue. <br />Exclusions <br />• Temporary power and lighting. <br />• Utility company charges. <br />• Low voltage systems of any kind. <br />• Repair or modification to existing equipment or wiring except as specifically noted <br />as included above. Repair to existing wiring or distribution. <br />• Permit fees <br />• Damage to existing utilities, damaged during excavation, not previously disclosed in <br />writing prior to excavation. <br />• Potholing or tracing of existing utilities. <br />• Removal or replacement of landscape, trees or softscape. <br />Valley High School/Santiago Park/Stadium <br />19