My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECHNOLOGIES (2) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:07:54 PM
Creation date
11/20/2009 10:27:41 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS BUILDING TECHNOLOGIES
Contract #
A-2009-144
Agency
PUBLIC WORKS
Council Approval Date
9/8/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Scope of Work City of Santa Ana Siemens Building Technologies, Inc. Phase II <br />• Santiago Park <br />• Stadium <br />Scope of Work: <br />Memorial Park <br />• Furnish and install new 480 volt, Nema 3R, free standing meter/main section. <br />• Install new feeder to area of MSB-1 to re-feed lighting loads for TOU service. <br />• New lighting feeder on TOU rate to be time clock controlled. TOU loads to be <br />opened by time clock during daylight hours and closed to allow power at dusk to <br />dawn hours. <br />• TOU metered loads must originate in Equipment room containing MSB-1. <br />• Removal and Patch of existing asphalt areas is included. <br />Assumptions <br />• Work to be done during regular hours <br />• Assumes Edison approves design to add raceway and tap feed from existing Edi- <br />son transformer vault. <br />• Feeder conductors type is at discretion of Briggs Electric, Inc. and will be code <br />compliant. Gear type and brand is assumed at discretion of Briggs Electric, Inc. <br />• Assumes new section can be installed adjacent to existing service. <br />• Assumes new gear as required in existing Equipment room containing MSB-1, may <br />be installed on exterior or equipment room if space and clearance is an issue. <br />Exclusions <br />• Temporary power and lighting. <br />• Utility company charges. <br />• Low voltage systems of any kind. <br />• Repair or modification to existing equipment or wiring except as specifically noted <br />as included above. Repair to existing wiring or distribution. <br />• Permit fees <br />• Damage to existing utilities, damaged during excavation, not previously disclosed in <br />writing prior to excavation. <br />• Potholing or tracing of existing utilities. <br />• Removal or replacement of landscape, trees or softscape. <br />Valley High School/Santiago Park/Stadium <br />19
The URL can be used to link to this page
Your browser does not support the video tag.