My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
D (INACTIVE)
>
DMS FACILITY SERVICES 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 3:00:00 PM
Creation date
4/23/2010 9:38:59 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS LANDSCAPE
Contract #
A-2010-027
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/31/2011
Insurance Exp Date
3/11/2012
Destruction Year
2016
Notes
Amended by A-2011-041
Document Relationships
DMS FACILITY SERVICES. LLC 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\D (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3 Home Plate Area/Batters Box Area Holes <br />7.3.1 Sweep/Rake away all loose brickdust. <br />7.3.2 Wet area until moist. <br />7.3.3 Scarify area (`s) [batters box hole(`s)] with shovel. This will help the <br />mix bind better. <br />7.3.4 In a 5 gallon bucket mix "mound mix" with water to desired consistency. <br />Do not use infield mix for this purpose. <br />7.3.5 Backfill "mound -mix" material into hole(`s). <br />7.3.6 Tamp the area firmly with steel tamp. <br />Note: The tamp will be most effective if you cover the bottom <br />with plastic. Tape the plastic to the tamp handle. The <br />plastic keeps the clay from sticking to the tamp's bottom. <br />7.3.7 After tamping and compacting the "mound mix" covers areas with <br />infield brick dust. <br />7.4 Pitcher's Mound <br />7.4.1 Follow same procedure for repair of home plate/batters box area utilizing <br />dry "mound mix" for this purpose. Do not cover with infield mix. <br />7.4.2 Add to the above the following: Rake all loose material from bottom to <br />top and cover with "Mound Mix". <br />7.5 General Brickdust Skinned Infield Areas <br />7.5.1 After raking/shoveling loose material from high spots back into low <br />spots/worn areas on running paths, sliding zones, and any other low <br />spots/worn areas appearing on the field, the Contractor shall fill all <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />7.5.2 The contractor shall clean all excess brickdust beneath or next to the <br />backstop, dugout chain link fencing and/or infield chain link fence lines <br />so that the infield brickdust is level with the dugout pavement and <br />pavement outside the infield. <br />7.5.3 Lightly water entire infield before dragging. <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.