My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
05/03/2010
>
FULL PACKET_2010-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 5:52:25 PM
Creation date
4/29/2010 8:27:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MAY 3, 2010 <br />TITLE: <br />CONTRACT AWARD FOR <br />RESIDENTIAL STREET REPAIR <br />PHASE 13 (PROJECT NO.106726) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1" Reading <br />❑ Ordinance on 2 "d Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to Hardy and Harper, Inc., the lowest responsible bidder, in accordance with <br />unit bid prices in the estimated amount of $2,777,000 for construction of Residential Street <br />Repair Phase 13. <br />2. Approve a Funding Analysis with a total estimated construction cost of $3,387,900. <br />DISCUSSION <br />Phase 13, which is the area bounded by Edinger Avenue, Bristol Street, Warner Avenue, and <br />Fairview Street, is part of the City's comprehensive plan to rebuild residential streets throughout <br />the city. Some of the streets located in this area have been identified as a high priority for <br />rehabilitation in the City's pavement management system. The pavement is deteriorating due to <br />weather, age, and heavy usage. Additionally, some of the adjacent curbs, gutters, sidewalks, <br />cross gutters, and curb ramps are in various states of disrepair and require replacement. <br />The contract provides for recycling of asphalt pavement with the cement treated base <br />reconstruction process or the cold -in -place recycling process, and replacing damaged concrete <br />curbs, gutters, sidewalks, cross gutters, and curb ramps. Once completed, these improvements <br />will enhance the ride quality, surface drainage, and visual appearance of the streets. <br />The Notice Inviting Bids was advertised on March 17 and 19, 2010, and bids were opened on <br />April 7, 2010. A summary of the bid invitations mailed, the bids received, and the bid results <br />follows. <br />Santa Ana Contractors receiving notices: 12 <br />Contractors requesting bidding documents: 11 <br />Bids received: 6 <br />Bids received from Santa Ana Contractors: 1 <br />23A -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.