Laserfiche WebLink
<br /> i <br /> 8IR No. 99-07, AA No. 04-01, <br /> • GPA No. 04-01, 2AA No. 04-02, <br /> DA No. 2004-01 and TPM No. 2004-02 <br /> July 6, 2004 <br /> Page 5 <br /> 8. Retaining the structure at 1109 N. Broadway (Koenig House) its <br /> current location. The Developer shall be responsible for the <br /> rehabilitation of the structure per City standards. <br /> Retaining and rehabilitating the Koenig House at its current <br /> location will enhance historic preservation and strengthen the <br /> atreetacape character of Broadway. In order to maintain the Koenig <br /> House on-site, egress from the parking structure onto Broadway has <br /> been modified to reduce the two egress lanes to a single lane with <br /> right-turn restrictions, which will include the construction of a <br /> landscaped median in Broadway. This will also allow the elimination <br /> of the previously proposed traffic signal. Staff from the Public <br /> Works Agency has evaluated the eflecte of these circulation changes, <br /> including an analysis of the levels of service of affected <br /> intersections, and found that they will result in no new significant <br /> traffic impacts. In fact, retaining the Koenig House will lessen <br /> the project's environmental effects by preserving, rehabilitating <br /> • and re-using a significant historic resource. <br /> The Mitigation Monitoring Program has been revised to reflect these <br /> changes. More specifically: Traffic Measure No. 18 (T-18) has been <br /> revised to eliminate the traffic signal and require a landscaped <br /> median in Broadway to prevent left turns; and, Cultural Resources <br /> Measures Nos. 1, 2, 4 and 9 (CR-1, CR-2, CR-4 and CR-9) have been <br /> revised to reflect the change requiring she Koenig House to be <br /> retained at its present location and to be rehabilitated by the <br /> applicant. <br /> The development agreement addressee the issues raised by the City Council <br /> at their March meeting. The tentative parcel map, which merges several <br /> existing lots on the project site, is in compliance with all applicable <br /> State and local regulations. The Final Environmental impact Report, <br /> Mitigation Monitoring Plan, Findings of Fact and Statement of Overriding <br /> Consideration for One Broadway Plaza has been revised to address the <br /> inclusion of a Development Agreement, the addition of mitigation measures <br /> to reduce impacts to historical resources and pedestrian safety, the <br /> construction of a student drop off for Orange County High School of the <br /> Arts and modifications to the egress of the project parking structure. <br /> Attached are the revisions to the Final Environmental Impact Report, <br /> Mitigation Monitoring Plan, Findings of Fact and Statement o! Overriding <br /> Consideration. <br /> • <br /> 75E-5 <br /> <br />