Laserfiche WebLink
City of Santa Ana | First Street Multimodal Boulevard Study <br />RFP NO. 25-029 | Appendix A: Key Staff Resumes & Support Staff Qualifications <br />Doug Smith, PE, RSP1 <br />Multimodal Concept Development - Traffic <br />Doug has over 45 years of broad experience in the management and development of transportation and traffic engineering projects on city and county roadway networks <br />throughout Southern California. His project experience includes numerous arterial street improvement traffic analyses, traffic management plans, complete streets and active <br />transportation design, intersection improvements, project study reports, and final designs. Additionally, Doug has assisted with developing integrated corridor management <br />plans, investment studies, feasibility studies, detailed implementation plans for specific operational projects, and before and after studies to evaluate project effectiveness. <br />He has worked on many projects in and around the City of Santa Ana, including design work on the Santa Ana Advanced Traffic Management System (ATMS), the original <br />environmental assessment for the OC Streetcar, the Central Orange County Corridor Major Investment Study (MIS), the South Orange County Multimodal Transportation Study, <br />and several regional roadway and rail projects. <br /> RELEVANT PROJECT EXPERIENCE <br />FIRM <br />HDR <br />EDUCATION <br />BS, Civil & Environmental <br />Engineering, University of <br />Rhode Island <br />Traffic Engineering Short Course, <br />Georgia Institute of Technology <br />Certificate in Management for <br />Engineering and Technology, <br />University of California, Irvine <br />REGISTRATIONS <br />PE, Civil, CA, #43549 <br />Road Safety Professional Level 1 <br />(RSP1), #1590 <br />INDUSTRY TENURE <br />45 years <br />FIRM TENURE <br />10 years <br />OCTA, South Orange County Multimodal Transportation Study (SOCMTS), <br />Orange County, CA <br />Traffic Engineering Lead. Doug supervised traffic/transportation analysis efforts, <br />including the development of the TSM/TDM alternative. He also assisted in the <br />conception of the arterial street system improvement elements of the alternatives <br />and provided input into the analysis of the locally preferred strategy. The project <br />defines a vision for transportation system in South Orange County that moves beyond <br />highway expansion to an integrated multimodal network. <br />City of Laguna Beach, Laguna Canyon Road (SR 133) PSR-PDS, Orange County, CA <br />Lead Traffic Engineer. Doug oversaw the traffic analysis and engineering performed <br />for the PSR traffic engineering performance assessment, including the VMT analysis <br />and multimodal LOS analysis for the transit, bicycle, and pedestrian modes of each <br />build alternative. Doug oversaw the traffic forecasting, analysis, design, and cost <br />estimating, including development of safety improvement concepts along the <br />corridor. HDR, in cooperation with the City of Laguna Beach and Caltrans District 12, <br />developed comprehensive alternatives evaluation criteria that translated to a well- <br />vetted PSR-PDS that was used to seek funding for the project and advanced to the <br />PA&ED phase. <br />City of Santa Ana Department of Public Works, Santa Ana Go Local Fixed Guideway <br />Project (OC Streetcar), Santa Ana, CA <br />Task Manager. Doug managed the traffic engineering/analysis and environmental <br />impact tasks for this proposed streetcar project from the Santa Ana Regional <br />Transportation Center to the Pacific Electric ROW at SR 22. He also developed a <br />concept for the TSP element of the project. <br />Orange County Public Works (OCPW), Engineering On-Call, Orange County, CA <br />Project Manager. Doug has managed several traffic engineering-related task order <br />projects, including the OC Loop Segment H Traffic Signal Modification, Newport <br />Avenue Fiber Optic PS&E, Santa Ana Gardens Bike Trail Phase I and II Lighting <br />Design, Rancho Mission Viejo Plan Check Support, and Traffic Control Plan Standards <br />Development. The tasks range from traffic/electrical design efforts to program <br />management support for county staff. <br />LA Metro, Lakewood/Rosemead Corridor Enhanced Transit Assessment, <br />Los Angeles County, CA <br />Traffic Engineering Lead. Doug led traffic engineering efforts in assessing the <br />feasibility of enhancing bus service along Lakewood/Rosemead Boulevard from Long <br />Beach to Pico Rivera. This effort included existing conditions analysis, development <br />of transit service alternatives from enhanced local service to full BRT, and ridership <br />forecasting using FTA-compliant processes. <br />LA Metro, North Hollywood to Pasadena BRT, Los Angeles County, CA <br />Traffic Design Lead. Doug is leading traffic design efforts for the project. With 22 <br />stations along an 18-mile alignment, this BRT corridor will serve as a key regional <br />connection between the San Fernando and San Gabriel Valleys, traversing the <br />communities of North Hollywood, Burbank, Glendale, Eagle Rock, and Pasadena. <br />Anticipated to attract approximately 30,000 daily riders, the project will serve as a <br />vital link to jobs, entertainment, and transit connections throughout the region. <br />A-09