City of Santa Ana | First Street Multimodal Boulevard Study
<br />RFP NO. 25-029 | Appendix A: Key Staff Resumes & Support Staff Qualifications
<br />Doug Smith, PE, RSP1
<br />Multimodal Concept Development - Traffic
<br />Doug has over 45 years of broad experience in the management and development of transportation and traffic engineering projects on city and county roadway networks
<br />throughout Southern California. His project experience includes numerous arterial street improvement traffic analyses, traffic management plans, complete streets and active
<br />transportation design, intersection improvements, project study reports, and final designs. Additionally, Doug has assisted with developing integrated corridor management
<br />plans, investment studies, feasibility studies, detailed implementation plans for specific operational projects, and before and after studies to evaluate project effectiveness.
<br />He has worked on many projects in and around the City of Santa Ana, including design work on the Santa Ana Advanced Traffic Management System (ATMS), the original
<br />environmental assessment for the OC Streetcar, the Central Orange County Corridor Major Investment Study (MIS), the South Orange County Multimodal Transportation Study,
<br />and several regional roadway and rail projects.
<br /> RELEVANT PROJECT EXPERIENCE
<br />FIRM
<br />HDR
<br />EDUCATION
<br />BS, Civil & Environmental
<br />Engineering, University of
<br />Rhode Island
<br />Traffic Engineering Short Course,
<br />Georgia Institute of Technology
<br />Certificate in Management for
<br />Engineering and Technology,
<br />University of California, Irvine
<br />REGISTRATIONS
<br />PE, Civil, CA, #43549
<br />Road Safety Professional Level 1
<br />(RSP1), #1590
<br />INDUSTRY TENURE
<br />45 years
<br />FIRM TENURE
<br />10 years
<br />OCTA, South Orange County Multimodal Transportation Study (SOCMTS),
<br />Orange County, CA
<br />Traffic Engineering Lead. Doug supervised traffic/transportation analysis efforts,
<br />including the development of the TSM/TDM alternative. He also assisted in the
<br />conception of the arterial street system improvement elements of the alternatives
<br />and provided input into the analysis of the locally preferred strategy. The project
<br />defines a vision for transportation system in South Orange County that moves beyond
<br />highway expansion to an integrated multimodal network.
<br />City of Laguna Beach, Laguna Canyon Road (SR 133) PSR-PDS, Orange County, CA
<br />Lead Traffic Engineer. Doug oversaw the traffic analysis and engineering performed
<br />for the PSR traffic engineering performance assessment, including the VMT analysis
<br />and multimodal LOS analysis for the transit, bicycle, and pedestrian modes of each
<br />build alternative. Doug oversaw the traffic forecasting, analysis, design, and cost
<br />estimating, including development of safety improvement concepts along the
<br />corridor. HDR, in cooperation with the City of Laguna Beach and Caltrans District 12,
<br />developed comprehensive alternatives evaluation criteria that translated to a well-
<br />vetted PSR-PDS that was used to seek funding for the project and advanced to the
<br />PA&ED phase.
<br />City of Santa Ana Department of Public Works, Santa Ana Go Local Fixed Guideway
<br />Project (OC Streetcar), Santa Ana, CA
<br />Task Manager. Doug managed the traffic engineering/analysis and environmental
<br />impact tasks for this proposed streetcar project from the Santa Ana Regional
<br />Transportation Center to the Pacific Electric ROW at SR 22. He also developed a
<br />concept for the TSP element of the project.
<br />Orange County Public Works (OCPW), Engineering On-Call, Orange County, CA
<br />Project Manager. Doug has managed several traffic engineering-related task order
<br />projects, including the OC Loop Segment H Traffic Signal Modification, Newport
<br />Avenue Fiber Optic PS&E, Santa Ana Gardens Bike Trail Phase I and II Lighting
<br />Design, Rancho Mission Viejo Plan Check Support, and Traffic Control Plan Standards
<br />Development. The tasks range from traffic/electrical design efforts to program
<br />management support for county staff.
<br />LA Metro, Lakewood/Rosemead Corridor Enhanced Transit Assessment,
<br />Los Angeles County, CA
<br />Traffic Engineering Lead. Doug led traffic engineering efforts in assessing the
<br />feasibility of enhancing bus service along Lakewood/Rosemead Boulevard from Long
<br />Beach to Pico Rivera. This effort included existing conditions analysis, development
<br />of transit service alternatives from enhanced local service to full BRT, and ridership
<br />forecasting using FTA-compliant processes.
<br />LA Metro, North Hollywood to Pasadena BRT, Los Angeles County, CA
<br />Traffic Design Lead. Doug is leading traffic design efforts for the project. With 22
<br />stations along an 18-mile alignment, this BRT corridor will serve as a key regional
<br />connection between the San Fernando and San Gabriel Valleys, traversing the
<br />communities of North Hollywood, Burbank, Glendale, Eagle Rock, and Pasadena.
<br />Anticipated to attract approximately 30,000 daily riders, the project will serve as a
<br />vital link to jobs, entertainment, and transit connections throughout the region.
<br />A-09
|