Laserfiche WebLink
NAME & ROLE TENURE <br />(INDUSTRY/FIRM)EDUCATION PROFESSIONAL <br />CREDENTIALS RELEVANT EXPERIENCE VALUE TO CITY OF SANTA ANA <br />Dina Rochford <br />Principal-in-Charge <br />32 years <br />< 1 year BA, Political Science - <br /> •OCTA, PMC Services for Capital Programs <br />• City of Irvine, City Specific Plan Update (Assistant to the Mayor) <br /> •McDonald’s, New Restaurant Expansions across Southern California <br />Dina works closely with residents, municipal governments, businesses, and political institutions to get community buy-in and projects built. Her <br />exceptional communication and management skills foster efficient and effective teamwork both internally and externally. As HDR’s Orange County <br />Area Transportation Program Manager, she will oversee continual availability of staff and corporate resources. <br />Christina Rodriguez <br />Website/Social Media <br />18 years <br />16 years BS, Biology - <br /> •City of Culver City, Transportation Planning On-Call - Various Task Orders <br /> •Mesa County (CO), Safe Streets and Roads for All (SS4A) Action Plan <br /> •Metropolitan Council (MN), METRO D Line BRT <br />Christina leads HDR’s Digital Engagement Team, providing creative direction, web strategy, web design and development, creative writing, and public <br />involvement support for infrastructure projects throughout the country. She designs innovative and interactive materials that engage audiences and <br />aid in project understanding and acceptance. <br />Damian Rodriguez, EIT <br />ADA Compliance <br />11 years <br />2 years BS, Civil Engineering - <br /> •OCTA, SR 55 Widening (I-5 to SR 91) <br /> •LA Metro, North Hollywood to Pasadena BRT <br /> •LABOE, Safe Sidewalks LA Program <br />Damian brings expertise in a diverse array of engineering software programs, including Civil 3D, InRoads, Microstation, AutoCAD, Synchro, Trimble <br />Business Center, Revit, and ArcGIS. Through his work on the Safe Sidewalks LA Program, he has gained a thorough understanding ADA standards for <br />pedestrian walkways at intersections to streets, roads, and highways. <br />Melissa Rodriguez, PE <br />Multimodal Integration Design <br />20 years <br />8 years BS, Civil Engineering PE - Civil, CA, #77982 <br /> •OCTA, SR 55 Widening (I-5 to SR 91) <br /> •LA Metro, North Hollywood to Pasadena BRT <br /> •LA Metro, SR 72/Whittier Boulevard Intersection Improvements PS&E <br />Melissa brings 20 years of planning and design experience for transportation projects, many with multimodal elements. She is skilled in project <br />management, roadway design, utility coordination and preliminary relocation design, stage construction and traffic handling plans, and quantities and <br />cost estimates. She has strong working relationships with Caltrans District 12 and many local cities. <br />Eric Rouse <br />Technical Advisor: Financial Strategy <br />29 years <br />18 years <br />MS, Community and Regional Planning <br />BS, Political Science and Government - <br /> •OCTA, OC Streetcar Program Management <br /> •City of Lake Elsinore, I-15/SR 74 Interchange Improvement <br /> •RCTC, PVL Transit Oriented Development (TOD) Pilot Program <br />Specializing in the financial, operational, and institutional analysis of existing and planned infrastructure programs, Eric has been instrumental in the <br />success of funding and financing strategies for transportation programs across the country. Through his experience on the OC Streetcar, Eric has <br />become an expert at navigating the financial and political landscape of the City and surrounding communities. <br />Erin Ryan (CPOG) <br />Community Engagement <br />17 years <br />< 1 year BS, Agricultural Science - <br /> •SBCTA, ONTConnector <br /> •City of Anaheim, City Manager’s Office - Senior Communications Specialist <br />(previous titles: Communications Specialist II, Public Information Specialist) <br />Erin brings a profound understanding of local municipal needs, preferences, operational frameworks, and resident/stakeholder perspectives and <br />concerns. She excels in creating strategic communications plans, managing diverse media relations, bringing stories to life in videos, and overseeing <br />public information operations. <br />Shea Saladee <br />Website/Social Media <br />13 years <br />6 years <br />MA, Mass Communications and Journalism <br />MA, Theatre <br />BA, Secondary Education <br />- <br /> •LACDPW, Proposition 218 Outreach Support <br /> •City of San Diego, Solid Waste Rate Study <br /> •City of Phoenix, Phoenix BRT Program Management <br />Shea is a highly skilled media practitioner who brings the latest theories and best practices in website creation, social media, public relations, digital <br />insight and analytics, and strategic communications to the team. Her ability to strategically plan and implement digital outreach strategies allows her <br />to communicate more effectively with targeted audiences. <br />Rebecca Shum, PE <br />Cost Estimating <br />13 years <br />8 years BS, Civil Engineering PE - Civil, CA, #83512 <br /> •OCTA, SR 55 Widening (I-5 to SR 91) <br /> •OCTA, SR 55 Widening (I-405 to I-5) <br /> •OCTA, SR 91 Improvements Segment 2 (SR 55 to SR 57) <br />Rebecca has a deep understanding of delivering high-quality roadway and highway design projects that are technically challenging and under <br />stringent schedules. Her extensive PS&E experience and long-term working relationship with Caltrans District 12 design and management staff have <br />fostered a smooth delivery and approval process for her projects in Orange County. <br />Susan Sugnet <br />Graphic Design/Visualization <br />27 years <br />4 years BA, Graphic Design - <br /> •City of Culver City, Transportation Planning On-Call - Various Task Orders <br /> •San Joaquin County DPW, Country Club Blvd. Complete Streets Corridor Plan <br /> •LACDPW, Proposition 218 Outreach Support <br />Susan is a seasoned graphic designer that can design and manage multiple visual communications simultaneously from concept to final production. <br />She is adept at creating compelling visuals for digital and print purposes, producing consistent branding throughout all collateral, and collaborating <br />with cross-functional teams and external partners. <br />Adrian Suzuki, RLA <br />Landscape Architecture <br />12 years <br />8 years <br />MA, Landscape Architecture <br />BA, Urban Design <br />Landscape Architect, CA, <br />#6889 <br /> •LABOE, Safe Sidewalks LA Program <br /> •LA Metro, Southeast Gateway Line Advanced Engineering <br /> •LA Metro, Link Union Station <br />An inquisitive and proactive individual, Adrian is driven to improve the build environment. He is experienced with community involvement, site <br />research and analysis, construction documentation, and the city approval processes. Adrian is proficient in computer-aided drafting techniques, <br />interdisciplinary communications, and illustrative hand-drawings. <br />Henry Tong, PE <br />Project Specifications <br />13 years <br />13 years <br />MS, Transportation Engineering <br />BS, Civil and Environmental Engineering PE - Civil, CA, #81357 <br /> •OCTA, SR 55 Widening (I-5 to SR 91) <br /> •LA Metro, North Hollywood to Pasadena BRT <br /> •LA Metro, Imperial Highway Corridor Capacity Enhancements <br />Henry’s experience includes final PS&E for numerous local and regional roadway and highway facilities, roadway geometrics (horizontal and vertical), <br />interchanges, analyses of Caltrans design exceptions, and preparation of detailed quantity and cost estimates. He specializes in civil surface modeling <br />with InRoads, preparing 3-D design models, and precise earthwork models. <br />Alyssa Trautz (CPOG) <br />Graphic Design/Visualization <br />14 years <br />< 1 year AA, Graphic Design - <br /> •OCTA, SR 55 Widening (I-405 to I-5) <br /> •OCTA, SR 91 Improvements Segment 2 (SR 55 to SR 57) <br /> •OCTA, I-605/Katella Avenue Interchange Project <br />Alyssa is a seasoned graphic designer with experience in community outreach for clients such as OCTA and Caltrans District 12. She has played a <br />pivotal role in designing and delivering impactful visual materials for public engagement campaigns that clearly communicate complex transportation <br />and construction projects to diverse audiences. <br />Alondra Villegas, PE <br />Traffic Engineering/Traffic Control Plans <br />5 years <br />5 years BS, Civil Engineering PE - Civil, CA, #97109 <br /> •LA Metro, North Hollywood to Pasadena BRT <br /> •OCTA, SR 55 Widening (I-405 to I-5) <br /> •OCTA, SR 91 Improvements Segment 2 (SR 55 to SR 57) <br />Utilizing software such as Bentley Power InRoads and AutoDesk Civil 3D, Alondra brings local experience in traffic engineering, roadway geometrics, <br />drainage analysis, and signage and striping. <br />Robert Yates <br />Funding/Grant Strategy <br />33 years <br />7 years BS, Geography/Urban and Regional Planning - <br /> •City of Culver City, Transportation Planning On-Call - Various Task Orders <br /> •LA Metro, Bus Network Restructuring Study <br /> •RCTC, Grant Support Services <br />Robert is an outside-the-box innovator in transportation project definition, transportation project development, and funding strategy design. He has <br />been instrumental in developing strategic planning studies for a number of clients as well as generating award-winning grant applications. <br />A-24 <br />City of Santa Ana | First Street Multimodal Boulevard Study <br />RFP NO. 25-029 | Appendix A: Key Staff Resumes & Support Staff Qualifications