My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CANNON CORPORATION (3)
Clerk
>
Contracts / Agreements
>
C
>
CANNON CORPORATION (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 2:13:57 PM
Creation date
5/20/2025 2:04:43 PM
Metadata
Fields
Template:
Contracts
Company Name
CANNON CORPORATION
Contract #
A-2025-018-02
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2028
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nnon <br />2024-2027 Fee Schedule <br />Rates will remain firm for the entire initial Agreement term <br />Electrical Associate Engineer <br />$ <br />195 <br />_ <br />Electrical Design Engineer <br />$ <br />157 <br />_ <br />Electrical Principal Designer_ <br />$ <br />157 <br />Electrical Sr. Principal Designer <br />~$ <br />Engineer Tech <br />$ <br />_173 <br />130 <br />Engineering Assistant l <br />$ <br />124 <br />Engineering Assistant ll ^� <br />$ <br />124 <br />Forensics Engineer III <br />$ <br />341 <br />Forensics Two -Man Survey Crew <br />$ <br />428 <br />Forensics Engineer 1 u <br />$ <br />281 <br />Forensics Engineer II <br />$ <br />308 <br />Forensics Expert Witness I <br />$ <br />308 <br />Forensics Expert Witness II_ <br />$ <br />430 <br />Forensics Expert Witness III <br />$ <br />552 <br />_ <br />_Forensics Office Administrator <br />$ <br />184 <br />Forensics Research & Investigation <br />$ <br />368 <br />Forensics Survey Tech l� <br />$ <br />282 <br />Forensics Survey Tech 11 ^y <br />$ <br />307 <br />Forensics Survey Tech III_ <br />_ <br />$ <br />344 <br />Grant Funding Manager <br />$ <br />168 <br />Grant Funding Manager 11 <br />$ <br />184 <br />I&E Principal Engineer <br />$ <br />238 <br />I&E Project Engineer <br />_ <br />$ <br />173 <br />I&E Senior Associate Engineer <br />$ <br />216 <br />I&E Senior Principal Engineer <br />$ <br />265 <br />I&E Senior Project Designer <br />$ <br />146 <br />I&E Senior Project Engineer <br />$ <br />178 <br />I&E Services Coordinator <br />$ <br />124 <br />Inside Wireman _ <br />$ <br />243 <br />Inside Wireman (PW OT) <br />$ <br />365 <br />Inside Wireman (PW DT) <br />$ <br />487 <br />Structural Senior Project Engineer <br />$ <br />184 <br />Structural Associate Engineer <br />$ <br />195 <br />Structural Design Engineer <br />$ <br />155 <br />Structural Principal Designer <br />$ <br />141 <br />_ <br />Structural Principal Engineer <br />$ <br />216 <br />Structural Project Engineer <br />$� <br />173 <br />Structural Senior Associate Engineer <br />$ <br />206 <br />Structural Senior CAD Technician <br />$ <br />130 <br />Structural Senior Principal Engineer <br />$ <br />238 <br />Structural Senior Project Designer <br />$ <br />135 <br />Structural Sr Principal Designer <br />$ <br />157 <br />Survey Assistant <br />$ <br />124 <br />Survey Technician l <br />$ <br />146 <br />_ <br />Survey Technician II <br />$ <br />Survey Technician 111 R <br />$ <br />_157 <br />168 <br />Survey Technician IV <br />$ <br />178 <br />Survey Technician V <br />$ <br />189 <br />_ _ <br />Telecommunications Technician W <br />$ <br />243 <br />Telecommunications Technician (PW OT) <br />$ <br />365 <br />Telecommunications Technician (PW DT) <br />$ <br />487 <br />Three -Man Field Crew <br />$ <br />566 <br />_Three -Man Field Crew (PW OT) <br />$ <br />Three -Man Field Crew (PW DT) <br />_849 <br />$ 1,131 <br />Two -Man Field Crew <br />$ <br />411 <br />Two -Man Field Crew (PW OT) <br />$ <br />617 <br />Two -Man Field Crew (PW DT) <br />$ <br />822 <br />Two -Man HDS Crew <br />$ <br />362 <br />Two -Man HDS Crew (PW OT) <br />$ <br />544 <br />Two -Man HDS Crew (PW DT) <br />$ <br />725 <br />If the client requests, or the client's schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for <br />weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests <br />field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the <br />client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed <br />holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be <br />charged for any Automation Field Service calls outside of normal working hours. Rates will remain firm for the entire initial Agreement term. <br />(effective 0712312024) <br />
The URL can be used to link to this page
Your browser does not support the video tag.