Laserfiche WebLink
AIRX Utility Surveyors, Inc. AIR <br />PREVAILING WAGE RATE SHEET <br />July 22, 2024 <br />Pricing on this document is valid for 90 days from the date above. <br />Prepared For: <br />Company Name Attn: Contact Name, Phone Number <br />Project Name: <br />Project Name, City of Project <br />Project Location: <br />Example: 16061 Avenida Venusto @ 18" RCP SD Tie -In <br />Total Number of Estimated Potholes: <br />Protect Management & Report Preparation <br />Project Management (USA Mark -Out / Standby Coord. / Pothole Layout) <br />No.: <br />0 <br />hours @ <br />165 <br />per hour= <br />$0 <br />Report drafting <br />No.: <br />0 <br />hours @ <br />125 <br />per hour= <br />$0 <br />Prevailing Wage Processing (Apprentice Reporting and Certified Payroll) <br />No.: <br />0 <br />hours @ <br />125 <br />per hour= <br />$0 <br />Specialty Training <br />No.: <br />0 <br />hours @ <br />140 <br />per hour- <br />$0 <br />Sub -total <br />$0 <br />Potholing <br />Potholing Daily Rate (2-man crew) <br />No.: <br />0 <br />@ <br />$4,000 <br />per day= <br />$0 <br />^^includes shoulder closure or narrow lane closure, backfill and AC cold patch <br />Third Laborer for Hot Patch Cap <br />No.: <br />0 <br />@ <br />$1,600 <br />per day= <br />$0 <br />Mobilization (portal-to-portal) <br />No.: <br />0 <br />@ <br />400 <br />per hour= <br />$0 <br />Potholing 1-Man / 1-Vacuum Truck Hourly Rate <br />No.: <br />0 <br />@ <br />275 <br />per hour= <br />$0 <br />Manhole Dips <br />No.: <br />0 <br />@ <br />100 <br />each= <br />$0 <br />Haulage and Dump Fee (Non -Hazardous only) <br />No.: <br />0 <br />@ <br />350 <br />per load= <br />$0 <br />Sub -total <br />$0 <br />Wet & Dry Utility Locating <br />Locating - 1 Man & Equipment (Elec, Mag, Sonic, GPR) <br />No.: <br />0 <br />hours @ <br />205 <br />per man hour- <br />$0 <br />Locating - CCTV Truck and 2 Crew <br />No.: <br />0 <br />hours @ <br />410 <br />per man hour- <br />$0 <br />Sub -total <br />$0 <br />Traffic Control <br />Traffic Control/ROW plans - 11"X17" <br />No.: <br />0 <br />@ <br />175 <br />p/sheet= <br />$0 <br />Permit processing <br />No.: <br />0 <br />hours @ <br />120 <br />per hour= <br />$0 <br />Minimal Traffic Control Equipment (w/CCTV only) <br />No.: <br />0 <br />each @ <br />150 <br />each= <br />$0 <br />Bike Lane, Shoulder or Narrow Lane Closure (Excludes Arrow Board) <br />No.: <br />0 <br />each @ <br />350 <br />each= <br />$0 <br />Small Intersections/Standard Lane Closures (Up to 500' + tapers) <br />No.: <br />0 <br />each @ <br />550 <br />each= <br />$0 <br />Large Intersections/Multiple Lane Closures <br />No.: <br />0 <br />each @ <br />750 <br />each= <br />$0 <br />Additional Arrow Board <br />No.: <br />0 <br />days @ <br />150 <br />per day= <br />$0 <br />Night Work Premium <br />No.: <br />0 <br />nights @ <br />350 <br />per night= <br />$0 <br />Certified Flagman /Addt'I Laborer No. Flagmen <br />0 <br />$145 <br />parheurfor <br />0 <br />hours= <br />$0 <br />Sub -total <br />$6 <br />Concrete and Asphalt Patching <br />Aquaphalt Permanent Patch w/Saw Cut <br />AC Hot Mix Patch w/Saw Cut (Crew of 2) <br />AC Hot Mix Patch Grind and Overlay (Crew of 4) <br />Coring - 12" Diameter <br />Sidewalk Panel Replacement <br />XBD2024 <br />Mals <br />No.: <br />0 <br />@ <br />150 each= <br />$0 <br />No.: <br />0 <br />@ <br />$3,500 per day= <br />$0 <br />No.: <br />0 <br />@ <br />$6,500 per day= <br />$0 <br />No.: <br />0 <br />@ <br />130 each= <br />$0 <br />No.: <br />0 <br />Call for Quote <br />$0 <br />Sub -total <br />$6 <br />Estimate Total: $OAO <br />Page 1 of 2 <br />