Laserfiche WebLink
Additional Notes. Fees & Exclusions: <br />(') All mobilization is charged portal to portal, This estimate is valid for 90 days. <br />• This estimate includes the provision for prevailing wage. Prevailing Wage rates are set by the California Department of Industrial Relations <br />(DIR) and subject to change annually per DIR regulations. Federalprevailing wage rates will also apply if applicable. <br />• DIR Determination:SC-102-1184-1 Craft: Horizontal Directional Drilling (Laborer) was used for the purpose of estimating Potholing and Locating Services <br />• DIR Determination:SC-23-102-2 Craft: Laborer and Related Classifications was used for the purpose of estimating Traffic Control Services <br />• If the determinations used for the purposes of this estimate are not correctfor your project, you must notify AirX Utility Surveyors Immediately so we can <br />revise the estimate. <br />• This is an estimate only based on limited information provided. Adjustments, changes and response to actual field conditions may incur <br />added costs. Final invoicing will reflect actual work hours performed, materials utilized and services provided. <br />• Utility Locating: Minimum charge of 2 man hours for Locating. AirX makes our best effort to find all utilities, but cannot guarantee that all utilities will be <br />located. Utilities must be potholed to guarantee location. It is requested that the Client provide to AIRX any documentation and map research of indexes and <br />databases that are available for additional research and information and to facilitate the locating process. AirX uses the latest in Electro-Magnetic, Sonic and <br />Ground Penetrating Radar Technologies to pinpoint underground utilities. Our staff are experts in and employ more traditional methods as well such as <br />dipping manholes, visual explorations, fish -tape, duct rods, and CCTV. AIRX locators will review all information, identify and mark out utilities as they exist in <br />the field, making note of changes, inconsistencies or unverified data. Any conflicts within the proposed project, inconsistencies or missing data in mapping <br />are then targeted for additional research, usually by potholing. AIRX will mark and utilize surface features or appurtenances that are directly associated with <br />any marked utilities in question. It is recommended that all utility mark out and associated surface features be recorded by way of survey and incorporated <br />into maps for the most comprehensive base mapping available. <br />• Utility Locating Limitations: AwX will make every effort to locate and mark -out the utilities in the requested area in the time allowed. However, AirX <br />cannot guarantee that all utilities can be located. Some limitations exist with locating methods based on the type of soil conditions encountered: Heavy <br />cobble,groundwater, rock or dense clay soil conditions and buried debris that may render locating useless. Closely aligned but unrelated facilities may distort <br />the surface field manifestations and yield phantoms or null fields. If adverse conditions are encountered AirX will cease the current operation and attempted <br />contact the client for further directions. AirX requires access to as many as -built drawings, architectural site and building plans as can be acquired. Utility <br />mark out will reflect the alignment and horizontal positioning of the utility only. Estimated depth determinations for this project can be provided but are not <br />considered reliable due to the number of interfaces penetrated and actual depths should only be determined through potholing or submarine visual <br />measurement. State law dictates that any excavations near burled utilities are researched thoroughly to confirm location and depth with the use of soft dig <br />technology (vacuum excavation) prior to actual excavation taking place. <br />• Client to facilitate access to site and utility cabinets or facilities in the area. AirX also requests copies of available as -built maps relating to the <br />project. <br />• Potholing and Excavation rate applies to typical conditions of asphalt or concrete surface material 6"-8" in depth and digable soil conditions. <br />Excessive surface material, concrete beneath asphalt, cobble, dense clay, CTB base, slurry, caliche or other medium will be charged at the hourly <br />rate listed on this estimate. <br />• Utility Locating: Minimum charge of 2 man hours for Locating. AirX makes our best effort to find all utilities, but cannot guarantee that all <br />utilities will be located. Utilities must be potholed to guarantee location. <br />Please Note: AIRX was contacted to locate all facilities the site for mapping Purposes to aid the client for desian. However, AIRX Is not a <br />representative of any stake holder . this geographic location, so this mark outdoes not qualify as a substitute for One Call or Dig Alert <br />which is a requirement Prior to any excavation by law. The only recourse is to oositiv Iv identify the facility by Potholing which would allow <br />or the precise measurement of an outside diameter. AIRX makes every effort to try and determine all attributes f the facilities involvedbut <br />some data can only be determined throuah potholing, <br />• Utility Re -Marking: Utilities previously marked and subsequently lost due to conditions beyond our control shall not be the responsibility of <br />AIRX. Re -marking will be charged at the utilitylocating rate indicated on this estimate. <br />• Traffic control and Right of Way plan drawing is on 11"x17" sheets. If D Sheets are required, additional fees will apply. <br />• Permit fees for right of way or traffic control permit review and deposits, are in addition to the Estimate Total. These fees will be paid by AirX <br />and charged back to the Client at cost plus 10%. This includes any deposits, bonds, or other associated fees that maybe required. Air( cannot <br />guarantee turn -around times for permit process. <br />• Standard traffic control includes all signs, cones, barricades, sign stands and caution tape and 1 arrow -board unless otherwise specified. <br />Specialty equipment such as non -typical signage, crash barrels, message boards or K-Rail are additional. <br />• AirX can provide certified flagman or additional laborers as needed at a rate of $175 per man/hour. <br />• Patching: Pricing allows for AC Cold Patch, quick Set Concrete Ora quality permanent patch with Aquaphalt only. Use of Aquaphalt product is <br />dependent upon agency acceptance and guaranteed for 3 years. Please request quote if other patching material or AC Hot Mix/Grinding is <br />required. <br />• Railroad Right of Way: Railroad Protective Liability Insurance will be required for all work within railroad right of way and may require <br />Railroad -designated flagging and utility mark -out personnel. Coordination of personnel may affect schedule of work. Final fees will be paid for <br />by AIRX and charged back to the Client at cost plus 10%. <br />• Hazardous Spoils: Testing, Storage, and Disposal of any material, hazardous or otherwise, will incur additional charge and based on project <br />requirements. If required, fees will be paid for by AirX and charged back to the Client at cost plus 10%. <br />• If air excavation is used, pricing assumes that spoils will be placed back into the hole onsite as backfill. If offsite disposal is required, an <br />additionalfee will incur. <br />• Specialty training due to project requirements may incur added time and cost and affectschedule of work. <br />• Work within Call railroad, environmentally sensitive or contaminated areas may incur additional costs. <br />• Night work, if required, will incur additional cost for balloon lighting, generators and barricade lights. <br />• All rates are based on a standard 40-hourwork week. Overtime, doubletime or holiday rates will apply if applicable. <br />• TERMS: All Invoices are due and payable NET 30 d vs from date of invoice. Plus 1 5% permanth thereafter <br />Authorization <br />Invoice Contact: <br />(Please include all persons that will be receiving invoicing correspondence) <br />Invoice Address: <br />(Please include all persons that will be receiving invoicing correspondence) <br />Invoice Email(s): <br />(Please include all persons that will be receiving invoicing correspondence.) <br />Page 2 of 2 <br />