My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/17/2025
>
Agenda Packet_2025-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2025 3:48:54 PM
Creation date
6/11/2025 3:42:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
6/17/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIAN Deliverables CLIFNT nr <br />MERIDIAN Base HRIS template. Backfill and delivery of the three (3) flat files <br />Configuration of the Meridian LMS HRIS to Meridian for processing: User Data, <br />Tool based upon the completed Organizations, Job Titles. <br />Requirements Document specified in task <br />B.2 above. <br />One preproduction load of a subset of <br />CLIENT production ready data for CAT <br />purposes. <br />One production lead of full user data into <br />the CLIENT production environmentwinplionsAcceptanceCriteria <br />One-way HRIS integration inbound to the HRIS Tool configured and tested per the <br />Meridian LMS application only. Requirements specified in task B.2 above, <br />Meridian configure the HRIS and load a in the Meridian LMS CLIENT Stage <br />subset of CLIENT production ready user environment. <br />data in the Meridian LMS CLIENT Stage One (1) final data load in Meridian LMS <br />environment for testing purposes. CLIENT Production environment. <br />MERIDIAN will conduct and support five (5) <br />days of Customer Acceptance Testing for <br />all tasks defined in section B herein. <br />Upon completion of CAT, MERIDIAN will <br />load a full set of CLIENT production data in <br />the Meridian LMS CLIENT production <br />environment. <br />S. Standard Setup Tasks: Production Installation <br />The purpose of this task is to complete the installation of the Meridian LMS base application, <br />database, configurations, branding and integrations into the Meridian LMS CLIENT production <br />environment. <br /> <br /> <br />City Council 13 – 30 6/17/2025
The URL can be used to link to this page
Your browser does not support the video tag.