Laserfiche WebLink
<br />Preparedness Grants Manual <br />within 15 calendar days of receiving notice of the award in the FEMA GO system, the 45-calendar <br />days pass-through period will begin 15 calendar days after the award notification is sent to the SAA <br />via the FEMA GO system. <br />It is important to note that the POP start date does not directly affect the start of the 45-calendar day <br />pass-through period. For example, an SAA may receive notice of the NSGP award on Aug. 20, 2023, <br />while the POP dates for that award are Sept. 1, 2023, through Aug. 31, 2026. In this example, the <br />45-day pass-through period will begin on the date the SAA accepts the NSGP award or Sept. 4, 2023 <br />(15 calendar days after the SAA was notified of the award), whichever date occurs first. The POP <br />start date of Sept. 1, 2023, would not affect the timing of meeting the 45-calendar day pass-through <br />requirement. <br />85