Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED PROPOSED LDEPARTMENT <br />FY 24-25 FEES FY 25-26 FEES CHANGES <br />53600 <br />51601 <br />53601 <br />53602 <br />53603 <br />53600 <br />53600 <br />51601 <br />53600 <br />51601 <br />51601 <br />51602 <br />51603 <br />51604 <br />53600 <br />53601 <br />53602 <br />53603 <br />X <br />(D <br />rn <br />O <br />C <br />O <br />N Z <br />cL] O <br />ro <br />100) <br />400 sf Ti and Seismic Reinforcement - Structural Plan Check <br />101) <br />400 sf TI and Seismic Reinforcement - Structural Insp <br />102) <br />400 sf TI and Seismic Reinforcement- EMP Plan Check <br />103) <br />Seismic Reinforcement Only <br />1041 <br />Parking Lot- 20 or fewer spaces Restriping -Structural Plan Check <br />105) <br />Parking Lot- 20 ar fewer spaces Restriping - Inspection <br />106) <br />Parking Lot->20 spaces Resurface -Structural Plan Check <br />107) <br />Parking Lot - >20 spaces sf Resurface- Insp <br />108) <br />Minimum Fee -Inspection <br />109) <br />Minimum Fee -Plan Check <br />73 <br />sq- ft- <br />0.67 <br />0.70 <br />sq. R. <br />0.53 <br />0.56 <br />see individual <br />item schedule <br />see individual <br />item schedule <br />sq. ft. <br />1.65 <br />1.73 <br />Pea Space <br />2.64 <br />2.77 <br />Per Space <br />2.64 <br />2.77 <br />Per Space <br />2.64 <br />2.77 <br />Per Space <br />2.64 <br />2.77 <br />Flat <br />194.68 <br />203.95 <br />Hourly, min 1/2 hr_ 269.90 282.75 <br />