Laserfiche WebLink
m ch <br />(D 0 <br />00 C <br />N = <br />0 0 <br />cn o <br />N ' <br />N <br />O <br />N <br />Uti <br />O <br />N <br />CD <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT Fm <br />ISCELLANEOUS FEE UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 24-25 FEES FY 25-26 FEES CHANGES <br />51601 <br />51602 <br />51603 <br />51604 <br />53600 <br />53601 <br />53602 <br />53603 <br />53600 <br />53600 <br />53600 <br />51601 <br />53600 <br />51601 <br />53600 <br />110) <br />Re -inspection <br />111) <br />Prelim Plan Check Review- per hour s) <br />112) <br />Energy PC - 4,000 sf. <br />113) <br />Energy PC - 8,000 sf <br />114) <br />Accessibility PC-4,000sf- Structural Plan Check <br />115) <br />Accessibility PC - 4,000 sf - Inspection <br />116) <br />Accessibility PC - 8,000 sf - Structural Plan Check <br />117) <br />Accessibility PC-8,000sf-Inspection <br />118) <br />Change of Use'J <br />Hourly 194.68 203.95 <br />Hourly 269.90 282.75 <br />sq. ft. <br />0.10 <br />0.12 <br />sq. ft. <br />Q10 <br />0.12 <br />sq. ft. <br />0.21 <br />0.22 <br />sq. ft. <br />0.06 <br />0.07 <br />sq. ft. <br />0.10 <br />0.12 <br />sq. ft. <br />0.05 <br />0.06 <br />Deposit <br />996.16 <br />1,033.10 <br />Modified Fee <br />Modified Fee <br />Modified Fee <br />Modified Fee <br />Modified Fee <br />74 <br />