Laserfiche WebLink
O <br />N <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT MISCELLANEOUS FEE I I UNITADOPTED PROPOSED DEPARTMENT <br />FY 24-25 FEES FY 25-26 FEES CHANGES <br />51603 <br />51603 <br />53601 <br />51603 <br />51603 <br />51603 <br />51603 <br />51603 <br />51603 <br />51603 <br />51603 <br />165) <br />Eiectrical Fees <br />Permit Issuance <br />166) <br />Minimum Fee (Nonresidential} <br />167) <br />Electrical Plan Check Fee (when required) <br />1681 <br />125 Volt Receptacle Outlets <br />169) <br />Light Switches, Occupancy Sensors <br />170) <br />Light Fixtures <br />171) <br />Air Conditioners, Heat Pumps <br />1721 <br />Factory -Wired Units (Solid Hook -Ups) <br />173) <br />Dedicated Circuits (15 or 20 AMP Receptacles) <br />174) <br />Time Clock, Photo -Cell, Time Switch <br />175) <br />Track -Light, Cable Tray, Special Raceway, Plugmold, <br />Under -Floor Duct, Plug -In Busways, Wiremcld, Etc. <br />Service Meter, Reset Mete;, Subpanel, Switchboard, Motor <br />Control Center, Transfer Switch, Husduct, or other Distribution <br />Equipment changes or modifications. <br />82 <br />66.88 <br />74.Ob <br />89.16 <br />93.40 <br />65%of Subtotal <br />65%of Subtotal <br />1.77 <br />1.95 <br />1.92 <br />2�01 <br />1.28 <br />1.34 <br />117.72 <br />123.32 <br />30.11 <br />31.54 <br />30.11 <br />31.54 <br />14.69 <br />15.39 <br />Each 100 ft. <br />or fraction thereof <br />30.11 <br />31.54 <br />