Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT E�� <br />OUS FEE UNIT ADAPTED PROPOSED DEPARTMENT <br />FY 24-25 FEES FY 25-26 FEES CHANGES <br />51603 <br />51603 <br />1603 <br />51603 <br />51603 <br />51603 <br />CD <br />Cn <br />0 <br />c <br />0 <br />-fl � <br />Z <br />0 <br />176) <br />Under400amperes <br />177) <br />400 amperes to 1,199 amperes <br />178) <br />1,200 amperes and over <br />Motor, Transformer, Welder, Industrial Equipment, Oven, <br />Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic <br />Panel or other Power Equipment. <br />179) <br />0 to 1 HP, kW or kVA <br />180) <br />Over 1 to 10 HP, kW or kVA <br />181) <br />Over 10 to 50 HP, kW or kVA <br />182) <br />Over 50 to 100 HP, kW or kVA <br />183) <br />Over 100 to 500 HP, kW or kVA <br />184) <br />Over 500 HP, kW or kVA <br />Low Voltage: phone, data outlet, speaker, thermostat, door holder, <br />doorbell, pull station, smoke detector, alarm device, card reader, etc. <br />185) <br />Commercial: <br />FIRST 10 devices or outlets <br />186) <br />Additional Devices <br />64.73 <br />67.81 <br />176.49 <br />184.89 <br />794.08 <br />308.08 <br />4.32 <br />4.53 <br />28.29 <br />29.64 <br />56.13 <br />58.80 <br />127.50 <br />133.57 <br />183.19 <br />191.91 <br />229.82 <br />239.71 <br />41.16 <br />43.12 <br />3.89 <br />4.09 <br />83 <br />