CITY OF SANTA ANA
<br /> a. Gar enclosure, including side walls, interior paneling, handralls, bases, car tops, car
<br /> lighting fixtures, reflectors, and drop ceilings, and if necessary, refinishing, repairing, or
<br /> replacing these Items.
<br /> b. Gar fan, gates and/or doors,
<br /> c. Holstway enclosure,
<br /> d. Rail alignment,
<br /> e. Hoistway doors,
<br /> L Door frames,
<br /> g. Sills,
<br /> In. Hoistway gates,
<br /> i. Finished flooding, power feeders switches and their wiring and fusing,
<br /> j. Gar light diffusers,
<br /> k. Light lubes or bulbs, and
<br /> I. Smoke or heat sensors.
<br /> 2. The Contractor shall be required to make all tests specified by governing code and ordinances,
<br /> but shall not be required to install new devices on the equipment, which may be recommended
<br /> or directed by Insurance companies, federal, state, municipal, or other authorities, to make
<br /> changes or modifications in design,to snake any replacements with parts of a different design, or
<br /> to perform cleaning of cab interior and exposed sills..
<br /> L. LI UIDATM DAMAGES
<br /> 1. When an elevator is out of service for a period in excess of forty-eight {48) hours, due to
<br /> Contractor's neglect or failure to comply with the provisions of this specifications, and should the
<br /> Contractor fail to respond with a qualified service man under the time frame indicated herein, it is
<br /> mutually agreed that the City may withhold as liquidated damages for each twenty-four(24) hour
<br /> period thereof, the sum of Two Hundred Fifty Collars ($250.00) from the succeeding month's
<br /> billing for each failure to timely respond to a request for services.
<br /> 2. Further, it Is mutually agreed that this sum Is. set our as liquidated damages because of the
<br /> impossibility of detenarining the an7ount of actual damages the City would suffer as a result of the
<br /> Contractor's failure to comply with this provision.
<br /> M. WIRING q1,6G BAMS, INSTRUCTION MANUALS, 1=TC_�
<br /> I. The Contractor agrees to furnish a complete set of electrical wiring diagrams for all of the
<br /> equipment covered by this contract,together with all supplemental information,such as instruction
<br /> manuals, lubrication charts, etc., that pertain to the equipment covered in this agreement,
<br /> 2. Should the Contractor not have this Information available, the City agrees to furnish this
<br /> information to the Contractor, to the extern available, at the Contractor's expense.
<br /> 3. However, requiring that the Contractor provide this information shall be considered part of his
<br /> previous experience with this specific type of equipment.
<br /> City of Santa Ana RFP No.25-007A Page 27 of 102
<br />
|