My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Construction Contract for the Local Street Preventative Maintenance FY 24-25
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
07/01/2025
>
Item 23 - Construction Contract for the Local Street Preventative Maintenance FY 24-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 11:20:03 AM
Creation date
6/26/2025 11:05:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Street Preventative Maintenance FY 24-25 <br />July 1, 2025 <br />Page 3 <br />recommends awarding the construction contract to Onyx Paving Company, Inc. for the <br />construction of this Project. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either staff or consultants and includes construction management, inspection of the <br />Contractor's work to ensure contract compliance, workmanship and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $3,735,000. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$2,988,000 <br />Construction Administration <br />$239,040 <br />Inspection <br />$149,400 <br />Testing <br />$59,760 <br />Project Contingencies <br />$298,800 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$3,735,000 <br />Project Schedule and Contract Time <br />The project completion date is October 29, 2025, barring unforeseeable conditions such <br />as rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The contract time for this project is 65 working days, as specified in the bid <br />documents. Working days are counted in accordance with the City's Standard <br />Specifications, which exclude weekends, City -observed holidays, and inclement <br />weather days that prevent work. <br />The actual completion date will depend on the contractor's schedule, material <br />procurement timelines, and any unforeseen delays. Based on a typical project timeline, <br />the estimated project milestones are provided below: <br />Protect Milestones <br />Milestone <br />Estimated <br />Notes <br />Completion Date <br />Administrative Startup <br />July 2, 2025 <br />Contract execution, bonds, <br />insurance <br />
The URL can be used to link to this page
Your browser does not support the video tag.