Laserfiche WebLink
Construction Contract for the McFadden Avenue Transit Signal Priority Project <br />July 1, 2025 <br />Page 3 <br />PlanetBids on April 30, 2025. No bid protest was submitted by any of the bidders during <br />the bid protest period. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Vido Samarzich, Inc. <br />Santa Ana, CA <br />$1,577,600 <br />2 <br />Excel Paving Co. <br />Long Beach, CA <br />$1,798,800 <br />NR <br />Estate Design and Construction <br />Los Angeles, CA <br />Non -responsive <br />A total of three bids were received and two were deemed responsive. Vido Samarzich, <br />Inc. submitted the lowest responsive base bid in the amount of $1,577,600 (Exhibit 2). <br />As specified in the bid documents, the lowest bid shall be determined on the basis of <br />the Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to Vido Samarzich, Inc. (Exhibit 3). <br />Vido Samarzich, Inc. has previously performed work as a prime contractor in the City of <br />Santa Ana within the past five years, including Glenwood Watermain Improvements, <br />10th Street and Flower Street Improvements, and are currently working on the Standard <br />and McFadden Bikeway Project. The contractor has performed satisfactorily on these <br />projects and staff recommends awarding the construction contract to Vido Samarzich, <br />Inc. for the construction of the Project. (Exhibit 3) <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either Staff or consultants and includes construction management, inspection of the <br />Contractor's work to ensure contract compliance, workmanship and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $1,972,000. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$1,577,600 <br />Construction Administration <br />$125,420 <br />Inspection <br />$80,457 <br />Testing <br />$30,763 <br />Project Contingencies <br />$157,760 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$1,972,000 <br />Project Schedule and Contract Time <br />