My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Construction Contract for McFadden Avenue Transit Signal Priority Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
07/01/2025
>
Item 22 - Construction Contract for McFadden Avenue Transit Signal Priority Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 11:19:45 AM
Creation date
6/26/2025 11:05:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contract for the McFadden Avenue Transit Signal Priority Project <br />July 1, 2025 <br />Page 4 <br />The project completion date is January 31, 2026, barring unforeseeable conditions such <br />as rain, natural disasters, or other delays beyond the control of the City and of the <br />Contractor. The contract time for this project is 120 working days, as specified in the bid <br />documents. Working days are counted in accordance with the City's Standard <br />Specifications, which exclude weekends, City -observed holidays, and inclement <br />weather days that prevent work. <br />The actual completion date will depend on the contractor's schedule, material <br />procurement timelines, and any unforeseen delays. Based on a typical project timeline, <br />the estimated project completion is provided below; <br />Project Milestones <br />Milestone <br />Estimated <br />Completion Date <br />Notes <br />Administrative Startup <br />July 2, 2025 <br />Contract execution, bonds, <br />insurance <br />Material Procurement <br />July 15, 2025 <br />Procurement will take place <br />concurrently with construction. <br />Contractor Mobilization <br />July 15, 2025 <br />Start of construction activities <br />Project Completion <br />I January 31, 2026 <br />1 Based on 120 workin da s <br />Project Phasing <br />The contractor will be constructing this project in coordination with the McFadden <br />Avenue Street Improvement project in the following phases: <br />1. Phase I: Concrete bus pad construction <br />2. Phase II: Bus shelter and lighting installation <br />3. Phase III: Installation of bus stop amenities and technology devices <br />Public Outreach <br />The project scope overlaps with the existing McFadden Avenue street improvement <br />project and occur concurrently and having benefited from outreach performed <br />associated with the street improvement project. The project will impact nearby <br />businesses and residences. To ensure timely and effective communication, the <br />following notification measures will be implemented prior to the start of construction: <br />• Electronic message signs will be installed two weeks in advance of construction <br />activities to provide early notice of the project's start date, <br />• A project information sign will be posted at the construction site, including contact <br />information for public inquiries, <br />• Residents and businesses within 1,000 feet of the project limits will receive door <br />hanger or mailed notifications at least two weeks before construction begins <br />• A second round of notification will be issued 48 hours prior to the start of <br />construction to residents and business adjacent to the limits of work, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.