My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreement for City Yard Fueling Station Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
07/01/2025
>
Item 17 - Agreement for City Yard Fueling Station Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 11:23:15 AM
Creation date
6/26/2025 11:20:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��7�Vard <br />ELEVATE VOUR PROCESS <br />,`SimplyFu�Soluflons <br />an EJ. Ward, Inc. company <br />Part # <br />TLS Replacement - Model/Description <br />Qty <br />Price <br />Extended <br />LABOR and <br />1 <br />$297,118.75 <br />$297,118.75 <br />HARDWARE <br />Prevailing Wage is <br />Overview of the Project Scope: <br />included. <br />Remove existing TLS <br />Replace it with a VR 450 <br />Includes Removal, Install, Permitting,... Includes Enclosure Cabinet <br />Includes Sensor Cable Replacement Includes Relocating to Car Wash Building <br />COMPLETE PROJECT SCOPE FOR TLS PROJECT IS IN NOTES SECTION <br />Part # <br />Future CNG fuel control terminal - Model/Description <br />Qty <br />Price <br />Extended <br />FCT-IOT-SH <br />5-hose Cellular IOT Terminal - Keypad Entry, FOB, CANceiver and TAG use enabled <br />1 <br />$7,462.68 <br />$7,462.68 <br />EXCLUDED: Any non standard cellular antenna configuration caused by a local environmental condition outside <br />E.J. Ward control. <br />CL-SMART-DBOX <br />Smart D-BOX with Firmware License <br />1 <br />$2,781.93 <br />$2,781.93 <br />LABORPM <br />Project Management (per hour) <br />8 <br />$160.00 <br />$1,280.00 <br />Shipping and Handling <br />1 <br />$525.00 <br />$525.00 <br />Subtotal <br />$531,142.26 <br />Hardware, SaaS and System Implementation Shown -with Standard One (1) YearWarranty <br />I Year 1 <br />Subtotal <br />$567,650.72 <br />Project Contingencyl <br />1 10% <br />$56,765.07 <br />Total <br />$624,415.79 <br />Notes: 1. Quote valid until 11-19-2025 <br />2. Annual agreement required on all SaaS Implementations, longerfixed fee terms available upon request. <br />3. Includes Lifetime Software Version Updates while on a SaaS Agreement <br />4. Includes 24x7x365 Call Center Support and lifetime IOT FCT parts replacement while on the SaaS platform (service labor at annual quoted <br />rates) <br />S. A M aximum of 24 rolling months of live data will be available, at additional cost longer archive periods are available for all SaaS customers. <br />6. Warranty DOES NOT include Hardware or Software that is declared "END OF LIFE" or previously declared unsupportable <br />7. Software use governed by the End User License Agreement (EULA) <br />CONTRACTOR SCOPE OF WORK: FOR VEEDER ROOT PROJECT: <br />Generate drawings and submit for permits with Orange County environmental health. Remove Veeder Root console system and install (1)new <br />Veeder Root TLS-4SOPIus with ethernet and RS-232 Port. All existing probes, sensors, overfill valve, line leak detectors, cabling and wire will <br />be reused. (5) New DPLLD line leak detectors will need to be supplied and replaced as existing are not compatible, (1) New Overfill Alarm and <br />Acknowledgment Switch will be supplied to replace existing unit. Overfill Alarm will be relocated to above red door it is currently mounted <br />next to. New Console will be installed in the same place existing unit is located. Relocate Veeder Root Console to Room at Fuel island. New <br />power and control wire conduits will be ran from breaker and junction boxes at Fuel Area in EMT. Existing sensors will be intercepted at an <br />existing inground transition, from which approximately 300'trench will be ran to the fuel island building. Fuel Sery will Sawcut and demo <br />approx. 300' lineal feet of concrete, excavate 18" deep, install 2" pvc, dispose of debris, drill and set dowels in remaining slab 24" on center, <br />Backfill and pour and finish concrete. PVC will be transitioned to steel prior to rising out of trench with a seal off and extend to Veeder root as <br />needed in EMT. Supply and pull new 2-wire shielded with drain cable from existing inground transition to the new Veeder Root location. <br />Trench will be coned and caution taped off to block traffic. Covering trench is not included, wood or steel plates to span trench for traffic is <br />not included, customer is welcome to supply and set steel plates in small area for traffic passage during work. Supply and pull new 2-wire <br />shielded with drain cable from existing Veeder Root to (36) Veeder Root Sensors, Probes, PLLDs, etc. Fuel Sery will terminate and land wire in <br />existing Veeder Root and Splice wire at each sensor/probes existing junction box. Total cable amount not to exceed 13,000 feet. Also it is <br />assumed all existing conduit both above and below ground is in good condition and will allow old cable removal and new cable installation. It <br />Is also assumed all conduit and junctions meet the requirement for dedication to sensor and probe cables only, if any other cabling or wiring is <br />found to be co -mingling It will have to be removed and rerouted at an additional cost. This includes low voltage or communication cable/wire. <br />This work is limited to the (5) tanks (3-uni 1-dsl 1-wo) and 9-fuel dispensers. Replacement ofjunction boxes due to frozen/missing/broken <br />lids up to (10) units are included in this quote along with (SO) seal offs. Upon completion perform function test of all sensors, positive <br />shutdown and overfill alarm. Schedule and perform (1) final inspection/ monitor cert with Orange County Environmental Health. NOTE: <br />Prevailing Wage is included. It is assumed all existing sensors and probes are Veeder Root MFG and all cabling for sensors and probes are <br />Beldon 2-wire with shield and drain, if not Replacement Sensors and Probes and Cabling are not included in this quote. TRENCH WILL CROSS <br />THE YARD AND CREATE HINDRANCE ON YARD TRAFFIC Contractor will work Monday thru Friday lam to 4pm and will not be restricted in <br />access unless a city recognized holiday is encountered during project. <br />EXCLUSIONS: If unforeseen conditions are encountered once installation begins EJ Ward will notify the Cityand ask for clarification on how to <br />proceed and will advise of any additional cost. Any requests by the city not specifically mentioned in the above scope of work will be an <br />additional cost. Bonding of any kind. <br />12621 Silicon Drive, Suite 113, San Antonio, TX 78249 <br />Tel: 210- 824-7383 <br />www.e'ward.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.