My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE BUBALO CONSTRUCTION, CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MIKE BUBALO CONSTRUCTION, CO., INC. (ROUSSELLE STREET FLOOD PROTECTION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 11:47:08 AM
Creation date
7/24/2025 11:10:40 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE BUBALO CONSTRUCTION, CO., INC.
Contract #
P23-6627
Agency
Public Works
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-• CITY OF SANTA ANA <br /> f PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 23-6627 Rousselle Street Flood Protection Project Change Order Number <br /> To Mike Bubalo Construction Co., Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To compensate the contractor for time, materials, and equipment associated with soil export and <br /> soil spreading at Lillie King Park to raise the elevation of the turf field per PCO #1 dated July 1, <br /> 2025. <br /> AGREED PRICE $21,310.79 <br /> 2. To compensate the contractor for a cast-in-place Reinforced Concrete Box (RCB) stormdrain on <br /> Rousselle Street near Warner Ave and stormdrain connection modifications per PCO #2 dated <br /> May 15, 2025. The pre-cast RCB could not be installed per plan due to the number of <br /> connections in this location. <br /> Agreed Price = $72,406.72 <br /> 3. To compensate the contractor for the demolition and disposal of a 2-foot thick concrete slab that <br /> conflicted with the Reinforced Concrete Box stormdrain installation per PCO #3 dated April 29, <br /> 2025. <br /> AGREED PRICE = $15,772.14 <br /> 4. To compensate the contractor for temporary slurry support and permanent slurry encasements <br /> placed over the water main crossings at E Anahurst Pl. and E St. Gertrude PI. in response to <br /> RFI 18 per PCO #4 dated June 16, 2025.Slurry encasement was necessary to protect the water <br /> line due to its shallow cover. <br /> Agreed Price = $12,704.97 <br /> 5. To compensate the contractor for the removal of approximately 6-feet of abandoned water main <br /> pipe per PCO #5 dated June 11, 2025. <br /> Agreed Price = $894.78 <br /> 6. To compensate the contractor to address saturated soil conditions in the stormdrain trench <br /> caused by overirrigation of adjacent City landscaping per PCO #6 dated August 7, 2025. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.